[{"country":"ie","series_key":"completions_lea_13100400","display_name":"New dwelling completions — Borris-In-Ossory-Mountmellick, Laois","region_label":"13100400","unit":"count","geography_id":"lea:13100400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":23.0,"data_refreshed_at":"2026-10-11T06:30:11.664814+00:00","prev_period_pct":35.294117647058826,"year_on_year_pct":-74.72527472527473,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13100401","display_name":"New dwelling completions — Portlaoise, Laois","region_label":"13100401","unit":"count","geography_id":"lea:13100401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":107.0,"data_refreshed_at":"2026-10-11T06:30:13.237231+00:00","prev_period_pct":-10.833333333333334,"year_on_year_pct":21.59090909090909,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13100402","display_name":"New dwelling completions — Graiguecullen -Portarlington, Laois","region_label":"13100402","unit":"count","geography_id":"lea:13100402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":75.0,"data_refreshed_at":"2026-10-11T06:30:14.799933+00:00","prev_period_pct":-29.245283018867923,"year_on_year_pct":47.05882352941176,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1310400","display_name":"New dwelling completions — Carlow, Carlow","region_label":"1310400","unit":"count","geography_id":"lea:1310400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":16.0,"data_refreshed_at":"2026-10-11T06:30:16.366592+00:00","prev_period_pct":-20.0,"year_on_year_pct":-40.74074074074074,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1310401","display_name":"New dwelling completions — Tullow, Carlow","region_label":"1310401","unit":"count","geography_id":"lea:1310401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":69.0,"data_refreshed_at":"2026-10-11T06:30:17.949764+00:00","prev_period_pct":263.15789473684214,"year_on_year_pct":305.88235294117646,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1310402","display_name":"New dwelling completions — Muinebeag, Carlow","region_label":"1310402","unit":"count","geography_id":"lea:1310402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":13.0,"data_refreshed_at":"2026-10-11T06:30:19.524825+00:00","prev_period_pct":30.0,"year_on_year_pct":30.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13110400","display_name":"New dwelling completions — Manorhamilton, Leitrim","region_label":"13110400","unit":"count","geography_id":"lea:13110400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":14.0,"data_refreshed_at":"2026-10-11T06:30:21.094757+00:00","prev_period_pct":27.27272727272727,"year_on_year_pct":75.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13110401","display_name":"New dwelling completions — Ballinamore, Leitrim","region_label":"13110401","unit":"count","geography_id":"lea:13110401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":6.0,"data_refreshed_at":"2026-10-11T06:30:22.664598+00:00","prev_period_pct":-66.66666666666666,"year_on_year_pct":-50.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13110402","display_name":"New dwelling completions — Carrick-On-Shannon, Leitrim","region_label":"13110402","unit":"count","geography_id":"lea:13110402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":12.0,"data_refreshed_at":"2026-10-11T06:30:24.237129+00:00","prev_period_pct":200.0,"year_on_year_pct":-7.6923076923076925,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13120400","display_name":"New dwelling completions — Newcastle West, Limerick","region_label":"13120400","unit":"count","geography_id":"lea:13120400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":34.0,"data_refreshed_at":"2026-10-11T06:30:25.814619+00:00","prev_period_pct":112.5,"year_on_year_pct":-8.108108108108109,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13120401","display_name":"New dwelling completions — Adare-Rathkeale, Limerick","region_label":"13120401","unit":"count","geography_id":"lea:13120401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":18.0,"data_refreshed_at":"2026-10-11T06:30:27.383956+00:00","prev_period_pct":5.88235294117647,"year_on_year_pct":-55.00000000000001,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13120402","display_name":"New dwelling completions — Cappamore-Kilmallock, Limerick","region_label":"13120402","unit":"count","geography_id":"lea:13120402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":46.0,"data_refreshed_at":"2026-10-11T06:30:28.957470+00:00","prev_period_pct":283.33333333333337,"year_on_year_pct":48.38709677419355,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13120420","display_name":"New dwelling completions — Limerick City West, Limerick","region_label":"13120420","unit":"count","geography_id":"lea:13120420","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":39.0,"data_refreshed_at":"2026-10-11T06:30:30.523550+00:00","prev_period_pct":-31.57894736842105,"year_on_year_pct":-7.142857142857142,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13120421","display_name":"New dwelling completions — Limerick City North, Limerick","region_label":"13120421","unit":"count","geography_id":"lea:13120421","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":23.0,"data_refreshed_at":"2026-10-11T06:30:32.111370+00:00","prev_period_pct":228.57142857142856,"year_on_year_pct":666.6666666666667,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13120422","display_name":"New dwelling completions — Limerick City East, Limerick","region_label":"13120422","unit":"count","geography_id":"lea:13120422","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":25.0,"data_refreshed_at":"2026-10-11T06:30:33.676704+00:00","prev_period_pct":-19.35483870967742,"year_on_year_pct":-63.23529411764706,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13130400","display_name":"New dwelling completions — Granard, Longford","region_label":"13130400","unit":"count","geography_id":"lea:13130400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":20.0,"data_refreshed_at":"2026-10-11T06:30:35.239125+00:00","prev_period_pct":0.0,"year_on_year_pct":66.66666666666666,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13130401","display_name":"New dwelling completions — Ballymahon, Longford","region_label":"13130401","unit":"count","geography_id":"lea:13130401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":9.0,"data_refreshed_at":"2026-10-11T06:30:36.811003+00:00","prev_period_pct":350.0,"year_on_year_pct":28.57142857142857,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13130402","display_name":"New dwelling completions — Longford, Longford","region_label":"13130402","unit":"count","geography_id":"lea:13130402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":35.0,"data_refreshed_at":"2026-10-11T06:30:38.396738+00:00","prev_period_pct":218.18181818181816,"year_on_year_pct":1066.6666666666665,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13140400","display_name":"New dwelling completions — Dundalk-Carlingford, Louth","region_label":"13140400","unit":"count","geography_id":"lea:13140400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":38.0,"data_refreshed_at":"2026-10-11T06:30:39.965251+00:00","prev_period_pct":-43.28358208955223,"year_on_year_pct":-17.391304347826086,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13140401","display_name":"New dwelling completions — Dundalk South, Louth","region_label":"13140401","unit":"count","geography_id":"lea:13140401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":94.0,"data_refreshed_at":"2026-10-11T06:30:41.528863+00:00","prev_period_pct":-13.761467889908257,"year_on_year_pct":-17.543859649122805,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13140402","display_name":"New dwelling completions — Ardee, Louth","region_label":"13140402","unit":"count","geography_id":"lea:13140402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":79.0,"data_refreshed_at":"2026-10-11T06:30:43.098882+00:00","prev_period_pct":203.84615384615384,"year_on_year_pct":295.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13140403","display_name":"New dwelling completions — Drogheda Rural, Louth","region_label":"13140403","unit":"count","geography_id":"lea:13140403","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":255.0,"data_refreshed_at":"2026-10-11T06:30:44.672646+00:00","prev_period_pct":57.407407407407405,"year_on_year_pct":42.45810055865922,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13140404","display_name":"New dwelling completions — Drogheda Urban, Louth","region_label":"13140404","unit":"count","geography_id":"lea:13140404","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":10.0,"data_refreshed_at":"2026-10-11T06:30:46.240014+00:00","prev_period_pct":-71.42857142857143,"year_on_year_pct":-85.07462686567165,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13150400","display_name":"New dwelling completions — Ballina, Mayo","region_label":"13150400","unit":"count","geography_id":"lea:13150400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":12.0,"data_refreshed_at":"2026-10-11T06:30:47.820662+00:00","prev_period_pct":-61.29032258064516,"year_on_year_pct":0.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13150401","display_name":"New dwelling completions — Claremorris, Mayo","region_label":"13150401","unit":"count","geography_id":"lea:13150401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":19.0,"data_refreshed_at":"2026-10-11T06:30:49.404823+00:00","prev_period_pct":46.15384615384615,"year_on_year_pct":-9.523809523809524,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13150402","display_name":"New dwelling completions — Castlebar, Mayo","region_label":"13150402","unit":"count","geography_id":"lea:13150402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":47.0,"data_refreshed_at":"2026-10-11T06:30:50.997581+00:00","prev_period_pct":46.875,"year_on_year_pct":104.34782608695652,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13150403","display_name":"New dwelling completions — Belmullet, Mayo","region_label":"13150403","unit":"count","geography_id":"lea:13150403","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":5.0,"data_refreshed_at":"2026-10-11T06:30:52.634833+00:00","prev_period_pct":-54.54545454545454,"year_on_year_pct":-70.58823529411765,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13150404","display_name":"New dwelling completions — Westport, Mayo","region_label":"13150404","unit":"count","geography_id":"lea:13150404","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":19.0,"data_refreshed_at":"2026-10-11T06:30:54.240878+00:00","prev_period_pct":-26.923076923076923,"year_on_year_pct":11.76470588235294,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13150405","display_name":"New dwelling completions — Swinford, Mayo","region_label":"13150405","unit":"count","geography_id":"lea:13150405","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":14.0,"data_refreshed_at":"2026-10-11T06:30:55.844184+00:00","prev_period_pct":-17.647058823529413,"year_on_year_pct":100.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13160400","display_name":"New dwelling completions — Kells, Meath","region_label":"13160400","unit":"count","geography_id":"lea:13160400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":64.0,"data_refreshed_at":"2026-10-11T06:30:57.411412+00:00","prev_period_pct":56.09756097560976,"year_on_year_pct":-20.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13160401","display_name":"New dwelling completions — Laytown-Bettystown, Meath","region_label":"13160401","unit":"count","geography_id":"lea:13160401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":53.0,"data_refreshed_at":"2026-10-11T06:30:58.992455+00:00","prev_period_pct":-10.16949152542373,"year_on_year_pct":-45.36082474226804,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13160402","display_name":"New dwelling completions — Ashbourne, Meath","region_label":"13160402","unit":"count","geography_id":"lea:13160402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":36.0,"data_refreshed_at":"2026-10-11T06:31:00.583262+00:00","prev_period_pct":-28.000000000000004,"year_on_year_pct":-59.09090909090909,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13160403","display_name":"New dwelling completions — Ratoath, Meath","region_label":"13160403","unit":"count","geography_id":"lea:13160403","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":78.0,"data_refreshed_at":"2026-10-11T06:31:02.159031+00:00","prev_period_pct":27.86885245901639,"year_on_year_pct":-6.024096385542169,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13160404","display_name":"New dwelling completions — Trim, Meath","region_label":"13160404","unit":"count","geography_id":"lea:13160404","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":123.0,"data_refreshed_at":"2026-10-11T06:31:03.734203+00:00","prev_period_pct":89.23076923076924,"year_on_year_pct":78.26086956521739,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13160405","display_name":"New dwelling completions — Navan, Meath","region_label":"13160405","unit":"count","geography_id":"lea:13160405","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":107.0,"data_refreshed_at":"2026-10-11T06:31:05.299518+00:00","prev_period_pct":434.99999999999994,"year_on_year_pct":67.1875,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13170400","display_name":"New dwelling completions — Monaghan, Monaghan","region_label":"13170400","unit":"count","geography_id":"lea:13170400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":58.0,"data_refreshed_at":"2026-10-11T06:31:06.874545+00:00","prev_period_pct":38.095238095238095,"year_on_year_pct":176.19047619047618,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13170401","display_name":"New dwelling completions — Carrickmacross-Castleblayney, Monaghan","region_label":"13170401","unit":"count","geography_id":"lea:13170401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":18.0,"data_refreshed_at":"2026-10-11T06:31:08.441318+00:00","prev_period_pct":-25.0,"year_on_year_pct":-35.714285714285715,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13170402","display_name":"New dwelling completions — Ballybay-Clones, Monaghan","region_label":"13170402","unit":"count","geography_id":"lea:13170402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":16.0,"data_refreshed_at":"2026-10-11T06:31:10.021641+00:00","prev_period_pct":23.076923076923077,"year_on_year_pct":0.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13180400","display_name":"New dwelling completions — Birr, Offaly","region_label":"13180400","unit":"count","geography_id":"lea:13180400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":27.0,"data_refreshed_at":"2026-10-11T06:31:11.583792+00:00","prev_period_pct":28.57142857142857,"year_on_year_pct":22.727272727272727,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13180401","display_name":"New dwelling completions — Tullamore, Offaly","region_label":"13180401","unit":"count","geography_id":"lea:13180401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":74.0,"data_refreshed_at":"2026-10-11T06:31:13.147698+00:00","prev_period_pct":196.0,"year_on_year_pct":164.28571428571428,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13180402","display_name":"New dwelling completions — Edenderry, Offaly","region_label":"13180402","unit":"count","geography_id":"lea:13180402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":46.0,"data_refreshed_at":"2026-10-11T06:31:14.713833+00:00","prev_period_pct":253.84615384615384,"year_on_year_pct":119.04761904761905,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13190400","display_name":"New dwelling completions — Boyle, Roscommon","region_label":"13190400","unit":"count","geography_id":"lea:13190400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":10.0,"data_refreshed_at":"2026-10-11T06:31:16.280053+00:00","prev_period_pct":-56.52173913043478,"year_on_year_pct":-16.666666666666664,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13190401","display_name":"New dwelling completions — Roscommon, Roscommon","region_label":"13190401","unit":"count","geography_id":"lea:13190401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":36.0,"data_refreshed_at":"2026-10-11T06:31:17.843936+00:00","prev_period_pct":260.0,"year_on_year_pct":300.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13190402","display_name":"New dwelling completions — Athlone, Roscommon","region_label":"13190402","unit":"count","geography_id":"lea:13190402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":28.0,"data_refreshed_at":"2026-10-11T06:31:19.413368+00:00","prev_period_pct":-20.0,"year_on_year_pct":250.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13200400","display_name":"New dwelling completions — Ballymote-Tobercurry, Sligo","region_label":"13200400","unit":"count","geography_id":"lea:13200400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":34.0,"data_refreshed_at":"2026-10-11T06:31:20.984434+00:00","prev_period_pct":17.24137931034483,"year_on_year_pct":6.25,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13200401","display_name":"New dwelling completions — Sligo-Drumcliff, Sligo","region_label":"13200401","unit":"count","geography_id":"lea:13200401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":49.0,"data_refreshed_at":"2026-10-11T06:31:22.544948+00:00","prev_period_pct":96.0,"year_on_year_pct":-23.4375,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13200402","display_name":"New dwelling completions — Sligo-Strandhill, Sligo","region_label":"13200402","unit":"count","geography_id":"lea:13200402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":29.0,"data_refreshed_at":"2026-10-11T06:31:24.115135+00:00","prev_period_pct":52.63157894736842,"year_on_year_pct":-40.816326530612244,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1320400","display_name":"New dwelling completions — Cavan-Belturbet, Cavan","region_label":"1320400","unit":"count","geography_id":"lea:1320400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":26.0,"data_refreshed_at":"2026-10-11T06:31:25.684235+00:00","prev_period_pct":62.5,"year_on_year_pct":-7.142857142857142,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1320401","display_name":"New dwelling completions — Bailieborough-Cootehill, Cavan","region_label":"1320401","unit":"count","geography_id":"lea:1320401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":57.0,"data_refreshed_at":"2026-10-11T06:31:27.251690+00:00","prev_period_pct":128.0,"year_on_year_pct":90.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1320402","display_name":"New dwelling completions — Ballyjamesduff, Cavan","region_label":"1320402","unit":"count","geography_id":"lea:1320402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":25.0,"data_refreshed_at":"2026-10-11T06:31:28.817317+00:00","prev_period_pct":-26.47058823529412,"year_on_year_pct":4.166666666666666,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13210400","display_name":"New dwelling completions — Nenagh, Tipperary","region_label":"13210400","unit":"count","geography_id":"lea:13210400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":31.0,"data_refreshed_at":"2026-10-11T06:31:30.393989+00:00","prev_period_pct":-41.509433962264154,"year_on_year_pct":158.33333333333331,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13210401","display_name":"New dwelling completions — Roscrea-Templemore, Tipperary","region_label":"13210401","unit":"count","geography_id":"lea:13210401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":18.0,"data_refreshed_at":"2026-10-11T06:31:31.962143+00:00","prev_period_pct":-45.45454545454545,"year_on_year_pct":20.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13210402","display_name":"New dwelling completions — Carrick-On-Suir, Tipperary","region_label":"13210402","unit":"count","geography_id":"lea:13210402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":8.0,"data_refreshed_at":"2026-10-11T06:31:33.534731+00:00","prev_period_pct":-77.14285714285715,"year_on_year_pct":-61.904761904761905,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13210403","display_name":"New dwelling completions — Clonmel, Tipperary","region_label":"13210403","unit":"count","geography_id":"lea:13210403","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":13.0,"data_refreshed_at":"2026-10-11T06:31:35.106883+00:00","prev_period_pct":-13.333333333333334,"year_on_year_pct":-86.5979381443299,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13210404","display_name":"New dwelling completions — Cashel-Tipperary, Tipperary","region_label":"13210404","unit":"count","geography_id":"lea:13210404","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":51.0,"data_refreshed_at":"2026-10-11T06:31:36.676706+00:00","prev_period_pct":121.73913043478262,"year_on_year_pct":59.375,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13210405","display_name":"New dwelling completions — Newport, Tipperary","region_label":"13210405","unit":"count","geography_id":"lea:13210405","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":17.0,"data_refreshed_at":"2026-10-11T06:31:38.244414+00:00","prev_period_pct":142.85714285714286,"year_on_year_pct":88.88888888888889,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13210406","display_name":"New dwelling completions — Thurles, Tipperary","region_label":"13210406","unit":"count","geography_id":"lea:13210406","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":24.0,"data_refreshed_at":"2026-10-11T06:31:39.815981+00:00","prev_period_pct":140.0,"year_on_year_pct":118.18181818181819,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13210407","display_name":"New dwelling completions — Cahir, Tipperary","region_label":"13210407","unit":"count","geography_id":"lea:13210407","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":7.0,"data_refreshed_at":"2026-10-11T06:31:41.388987+00:00","prev_period_pct":40.0,"year_on_year_pct":-46.15384615384615,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13220400","display_name":"New dwelling completions — Dungarvan, Waterford","region_label":"13220400","unit":"count","geography_id":"lea:13220400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":16.0,"data_refreshed_at":"2026-10-11T06:31:42.961822+00:00","prev_period_pct":33.33333333333333,"year_on_year_pct":-5.88235294117647,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13220401","display_name":"New dwelling completions — Portlaw-Kilmacthomas, Waterford","region_label":"13220401","unit":"count","geography_id":"lea:13220401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":20.0,"data_refreshed_at":"2026-10-11T06:31:44.525503+00:00","prev_period_pct":66.66666666666666,"year_on_year_pct":-33.33333333333333,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13220402","display_name":"New dwelling completions — Lismore, Waterford","region_label":"13220402","unit":"count","geography_id":"lea:13220402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":7.0,"data_refreshed_at":"2026-10-11T06:31:46.093249+00:00","prev_period_pct":-50.0,"year_on_year_pct":16.666666666666664,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13220420","display_name":"New dwelling completions — Tramore-Waterford City West, Waterford","region_label":"13220420","unit":"count","geography_id":"lea:13220420","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":14.0,"data_refreshed_at":"2026-10-11T06:31:47.658330+00:00","prev_period_pct":7.6923076923076925,"year_on_year_pct":-74.54545454545455,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13220421","display_name":"New dwelling completions — Waterford City South, Waterford","region_label":"13220421","unit":"count","geography_id":"lea:13220421","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":42.0,"data_refreshed_at":"2026-10-11T06:31:49.219765+00:00","prev_period_pct":-39.130434782608695,"year_on_year_pct":366.66666666666663,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13220422","display_name":"New dwelling completions — Waterford City East, Waterford","region_label":"13220422","unit":"count","geography_id":"lea:13220422","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":52.0,"data_refreshed_at":"2026-10-11T06:31:50.788734+00:00","prev_period_pct":-8.771929824561402,"year_on_year_pct":205.88235294117646,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13230400","display_name":"New dwelling completions — Athlone, Westmeath","region_label":"13230400","unit":"count","geography_id":"lea:13230400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":51.0,"data_refreshed_at":"2026-10-11T06:31:52.366227+00:00","prev_period_pct":537.5,"year_on_year_pct":-27.142857142857142,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13230401","display_name":"New dwelling completions — Moate, Westmeath","region_label":"13230401","unit":"count","geography_id":"lea:13230401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":24.0,"data_refreshed_at":"2026-10-11T06:31:53.937644+00:00","prev_period_pct":100.0,"year_on_year_pct":-4.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13230402","display_name":"New dwelling completions — Kinnegad, Westmeath","region_label":"13230402","unit":"count","geography_id":"lea:13230402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":18.0,"data_refreshed_at":"2026-10-11T06:31:55.505048+00:00","prev_period_pct":-5.263157894736842,"year_on_year_pct":5.88235294117647,"caveats":[{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13230403","display_name":"New dwelling completions — Mullingar, Westmeath","region_label":"13230403","unit":"count","geography_id":"lea:13230403","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":75.0,"data_refreshed_at":"2026-10-11T06:31:57.075485+00:00","prev_period_pct":316.66666666666663,"year_on_year_pct":-39.516129032258064,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13240400","display_name":"New dwelling completions — Gorey, Wexford","region_label":"13240400","unit":"count","geography_id":"lea:13240400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":83.0,"data_refreshed_at":"2026-10-11T06:31:58.750813+00:00","prev_period_pct":5.063291139240507,"year_on_year_pct":-11.702127659574469,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13240401","display_name":"New dwelling completions — Kilmuckridge, Wexford","region_label":"13240401","unit":"count","geography_id":"lea:13240401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":10.0,"data_refreshed_at":"2026-10-11T06:32:00.326131+00:00","prev_period_pct":-50.0,"year_on_year_pct":-28.57142857142857,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13240402","display_name":"New dwelling completions — New Ross, Wexford","region_label":"13240402","unit":"count","geography_id":"lea:13240402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":24.0,"data_refreshed_at":"2026-10-11T06:32:01.897640+00:00","prev_period_pct":-61.29032258064516,"year_on_year_pct":41.17647058823529,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13240403","display_name":"New dwelling completions — Rosslare, Wexford","region_label":"13240403","unit":"count","geography_id":"lea:13240403","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":25.0,"data_refreshed_at":"2026-10-11T06:32:03.492774+00:00","prev_period_pct":19.047619047619047,"year_on_year_pct":-45.65217391304348,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13240404","display_name":"New dwelling completions — Wexford, Wexford","region_label":"13240404","unit":"count","geography_id":"lea:13240404","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":89.0,"data_refreshed_at":"2026-10-11T06:32:05.062968+00:00","prev_period_pct":56.14035087719298,"year_on_year_pct":304.54545454545456,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13240405","display_name":"New dwelling completions — Enniscorthy, Wexford","region_label":"13240405","unit":"count","geography_id":"lea:13240405","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":39.0,"data_refreshed_at":"2026-10-11T06:32:06.627511+00:00","prev_period_pct":-25.0,"year_on_year_pct":-51.24999999999999,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13250400","display_name":"New dwelling completions — Baltinglass, Wicklow","region_label":"13250400","unit":"count","geography_id":"lea:13250400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":31.0,"data_refreshed_at":"2026-10-11T06:32:08.190638+00:00","prev_period_pct":-35.41666666666667,"year_on_year_pct":29.166666666666668,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13250401","display_name":"New dwelling completions — Bray West, Wicklow","region_label":"13250401","unit":"count","geography_id":"lea:13250401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":29.0,"data_refreshed_at":"2026-10-11T06:32:09.753733+00:00","prev_period_pct":141.66666666666669,"year_on_year_pct":190.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13250402","display_name":"New dwelling completions — Greystones, Wicklow","region_label":"13250402","unit":"count","geography_id":"lea:13250402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":42.0,"data_refreshed_at":"2026-10-11T06:32:11.336792+00:00","prev_period_pct":-8.695652173913043,"year_on_year_pct":425.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13250403","display_name":"New dwelling completions — Wicklow, Wicklow","region_label":"13250403","unit":"count","geography_id":"lea:13250403","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":68.0,"data_refreshed_at":"2026-10-11T06:32:12.897919+00:00","prev_period_pct":-41.37931034482759,"year_on_year_pct":-64.3979057591623,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13250404","display_name":"New dwelling completions — Arklow, Wicklow","region_label":"13250404","unit":"count","geography_id":"lea:13250404","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":17.0,"data_refreshed_at":"2026-10-11T06:32:14.461539+00:00","prev_period_pct":-56.41025641025641,"year_on_year_pct":-37.03703703703704,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13250405","display_name":"New dwelling completions — Bray East, Wicklow","region_label":"13250405","unit":"count","geography_id":"lea:13250405","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":11.0,"data_refreshed_at":"2026-10-11T06:32:16.027366+00:00","prev_period_pct":1000.0,"year_on_year_pct":-15.384615384615385,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260400","display_name":"New dwelling completions — Rush-Lusk, Fingal","region_label":"13260400","unit":"count","geography_id":"lea:13260400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":249.0,"data_refreshed_at":"2026-10-11T06:32:17.594894+00:00","prev_period_pct":72.91666666666666,"year_on_year_pct":-13.541666666666666,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260401","display_name":"New dwelling completions — Swords, Fingal","region_label":"13260401","unit":"count","geography_id":"lea:13260401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":372.0,"data_refreshed_at":"2026-10-11T06:32:19.157193+00:00","prev_period_pct":389.4736842105263,"year_on_year_pct":313.3333333333333,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260402","display_name":"New dwelling completions — Blanchardstown-Mulhuddart, Fingal","region_label":"13260402","unit":"count","geography_id":"lea:13260402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":196.0,"data_refreshed_at":"2026-10-11T06:32:20.728937+00:00","prev_period_pct":31.543624161073826,"year_on_year_pct":-60.87824351297405,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260403","display_name":"New dwelling completions — Castleknock, Fingal","region_label":"13260403","unit":"count","geography_id":"lea:13260403","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":35.0,"data_refreshed_at":"2026-10-11T06:32:22.295147+00:00","prev_period_pct":-10.256410256410255,"year_on_year_pct":-66.01941747572816,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260404","display_name":"New dwelling completions — Howth-Malahide, Fingal","region_label":"13260404","unit":"count","geography_id":"lea:13260404","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":120.0,"data_refreshed_at":"2026-10-11T06:32:23.865505+00:00","prev_period_pct":421.7391304347826,"year_on_year_pct":33.33333333333333,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260405","display_name":"New dwelling completions — Stillorgan, Dún Laoghaire-Rathdown","region_label":"13260405","unit":"count","geography_id":"lea:13260405","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":28.0,"data_refreshed_at":"2026-10-11T06:32:25.429842+00:00","prev_period_pct":-58.2089552238806,"year_on_year_pct":33.33333333333333,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260406","display_name":"New dwelling completions — Dundrum, Dún Laoghaire-Rathdown","region_label":"13260406","unit":"count","geography_id":"lea:13260406","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":12.0,"data_refreshed_at":"2026-10-11T06:32:26.994606+00:00","prev_period_pct":300.0,"year_on_year_pct":-85.36585365853658,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260407","display_name":"New dwelling completions — Glencullen-Sandyford, Dún Laoghaire-Rathdown","region_label":"13260407","unit":"count","geography_id":"lea:13260407","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":2.0,"data_refreshed_at":"2026-10-11T06:32:28.568896+00:00","prev_period_pct":-96.7741935483871,"year_on_year_pct":-99.12663755458514,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260408","display_name":"New dwelling completions — Killiney-Shankill, Dún Laoghaire-Rathdown","region_label":"13260408","unit":"count","geography_id":"lea:13260408","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":247.0,"data_refreshed_at":"2026-10-11T06:32:30.133673+00:00","prev_period_pct":26.666666666666668,"year_on_year_pct":-46.30434782608695,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260409","display_name":"New dwelling completions — Dún Laoghaire, Dún Laoghaire-Rathdown","region_label":"13260409","unit":"count","geography_id":"lea:13260409","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":3.0,"data_refreshed_at":"2026-10-11T06:32:31.697011+00:00","prev_period_pct":-62.5,"year_on_year_pct":-84.21052631578947,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260410","display_name":"New dwelling completions — Blackrock, Dún Laoghaire-Rathdown","region_label":"13260410","unit":"count","geography_id":"lea:13260410","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":16.0,"data_refreshed_at":"2026-10-11T06:32:33.281138+00:00","prev_period_pct":-5.88235294117647,"year_on_year_pct":0.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260411","display_name":"New dwelling completions — Lucan, South Dublin","region_label":"13260411","unit":"count","geography_id":"lea:13260411","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":284.0,"data_refreshed_at":"2026-10-11T06:32:34.845957+00:00","prev_period_pct":63.2183908045977,"year_on_year_pct":192.7835051546392,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260412","display_name":"New dwelling completions — Tallaght Central, South Dublin","region_label":"13260412","unit":"count","geography_id":"lea:13260412","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":1.0,"data_refreshed_at":"2026-10-11T06:32:36.411665+00:00","prev_period_pct":null,"year_on_year_pct":-88.88888888888889,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260413","display_name":"New dwelling completions — Rathfarnham-Templeogue, South Dublin","region_label":"13260413","unit":"count","geography_id":"lea:13260413","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":4.0,"data_refreshed_at":"2026-10-11T06:32:37.980131+00:00","prev_period_pct":-33.33333333333333,"year_on_year_pct":-92.98245614035088,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260414","display_name":"New dwelling completions — Firhouse-Bohernabreena, South Dublin","region_label":"13260414","unit":"count","geography_id":"lea:13260414","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":72.0,"data_refreshed_at":"2026-10-11T06:32:39.545722+00:00","prev_period_pct":157.14285714285714,"year_on_year_pct":-8.860759493670885,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260415","display_name":"New dwelling completions — Tallaght South, South Dublin","region_label":"13260415","unit":"count","geography_id":"lea:13260415","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":14.0,"data_refreshed_at":"2026-10-11T06:32:41.105436+00:00","prev_period_pct":-6.666666666666667,"year_on_year_pct":-95.08771929824562,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260416","display_name":"New dwelling completions — Clondalkin, South Dublin","region_label":"13260416","unit":"count","geography_id":"lea:13260416","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":198.0,"data_refreshed_at":"2026-10-11T06:32:42.669159+00:00","prev_period_pct":-61.77606177606177,"year_on_year_pct":102.04081632653062,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260417","display_name":"New dwelling completions — Balbriggan, Fingal","region_label":"13260417","unit":"count","geography_id":"lea:13260417","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":22.0,"data_refreshed_at":"2026-10-11T06:32:44.231936+00:00","prev_period_pct":2100.0,"year_on_year_pct":-84.39716312056737,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260418","display_name":"New dwelling completions — Ongar, Fingal","region_label":"13260418","unit":"count","geography_id":"lea:13260418","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":26.0,"data_refreshed_at":"2026-10-11T06:32:45.795487+00:00","prev_period_pct":null,"year_on_year_pct":333.33333333333337,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260419","display_name":"New dwelling completions — Palmerstown-Fonthill, South Dublin","region_label":"13260419","unit":"count","geography_id":"lea:13260419","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":0.0,"data_refreshed_at":"2026-10-11T06:32:47.359875+00:00","prev_period_pct":-100.0,"year_on_year_pct":-100.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260420","display_name":"New dwelling completions — Ballymun-Finglas, Dublin City","region_label":"13260420","unit":"count","geography_id":"lea:13260420","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":35.0,"data_refreshed_at":"2026-10-11T06:32:48.937024+00:00","prev_period_pct":-23.91304347826087,"year_on_year_pct":3400.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260421","display_name":"New dwelling completions — Cabra-Glasnevin, Dublin City","region_label":"13260421","unit":"count","geography_id":"lea:13260421","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":465.0,"data_refreshed_at":"2026-10-11T06:32:50.504174+00:00","prev_period_pct":113.30275229357798,"year_on_year_pct":222.91666666666666,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260422","display_name":"New dwelling completions — Ballyfermot-Drimnagh, Dublin City","region_label":"13260422","unit":"count","geography_id":"lea:13260422","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":68.0,"data_refreshed_at":"2026-10-11T06:32:52.071452+00:00","prev_period_pct":-40.35087719298245,"year_on_year_pct":-8.108108108108109,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260423","display_name":"New dwelling completions — Kimmage-Rathmines, Dublin City","region_label":"13260423","unit":"count","geography_id":"lea:13260423","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":5.0,"data_refreshed_at":"2026-10-11T06:32:53.636439+00:00","prev_period_pct":25.0,"year_on_year_pct":-97.17514124293785,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260424","display_name":"New dwelling completions — Pembroke, Dublin City","region_label":"13260424","unit":"count","geography_id":"lea:13260424","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":10.0,"data_refreshed_at":"2026-10-11T06:32:55.201684+00:00","prev_period_pct":-88.63636363636364,"year_on_year_pct":-80.3921568627451,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260425","display_name":"New dwelling completions — South East Inner City, Dublin City","region_label":"13260425","unit":"count","geography_id":"lea:13260425","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":47.0,"data_refreshed_at":"2026-10-11T06:32:56.767190+00:00","prev_period_pct":-77.18446601941747,"year_on_year_pct":-67.8082191780822,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260426","display_name":"New dwelling completions — North Inner City, Dublin City","region_label":"13260426","unit":"count","geography_id":"lea:13260426","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":194.0,"data_refreshed_at":"2026-10-11T06:32:58.330911+00:00","prev_period_pct":-23.92156862745098,"year_on_year_pct":-51.13350125944584,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260427","display_name":"New dwelling completions — Clontarf, Dublin City","region_label":"13260427","unit":"count","geography_id":"lea:13260427","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":12.0,"data_refreshed_at":"2026-10-11T06:32:59.895929+00:00","prev_period_pct":200.0,"year_on_year_pct":-85.54216867469879,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260428","display_name":"New dwelling completions — Donaghmede, Dublin City","region_label":"13260428","unit":"count","geography_id":"lea:13260428","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":164.0,"data_refreshed_at":"2026-10-11T06:33:01.471405+00:00","prev_period_pct":264.44444444444446,"year_on_year_pct":1722.2222222222222,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260429","display_name":"New dwelling completions — Artane-Whitehall, Dublin City","region_label":"13260429","unit":"count","geography_id":"lea:13260429","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":265.0,"data_refreshed_at":"2026-10-11T06:33:03.050788+00:00","prev_period_pct":960.0,"year_on_year_pct":6525.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260430","display_name":"New dwelling completions — South West Inner City, Dublin City","region_label":"13260430","unit":"count","geography_id":"lea:13260430","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":15.0,"data_refreshed_at":"2026-10-11T06:33:04.620659+00:00","prev_period_pct":87.5,"year_on_year_pct":-75.80645161290323,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1330400","display_name":"New dwelling completions — Ennistimon, Clare","region_label":"1330400","unit":"count","geography_id":"lea:1330400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":40.0,"data_refreshed_at":"2026-10-11T06:33:06.182837+00:00","prev_period_pct":122.22222222222223,"year_on_year_pct":100.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1330401","display_name":"New dwelling completions — Killaloe, Clare","region_label":"1330401","unit":"count","geography_id":"lea:1330401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":22.0,"data_refreshed_at":"2026-10-11T06:33:07.755400+00:00","prev_period_pct":-56.00000000000001,"year_on_year_pct":-47.61904761904761,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1330402","display_name":"New dwelling completions — Shannon, Clare","region_label":"1330402","unit":"count","geography_id":"lea:1330402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":54.0,"data_refreshed_at":"2026-10-11T06:33:09.318379+00:00","prev_period_pct":-5.263157894736842,"year_on_year_pct":86.20689655172413,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1330403","display_name":"New dwelling completions — Ennis, Clare","region_label":"1330403","unit":"count","geography_id":"lea:1330403","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":34.0,"data_refreshed_at":"2026-10-11T06:33:10.885842+00:00","prev_period_pct":112.5,"year_on_year_pct":-53.42465753424658,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1330404","display_name":"New dwelling completions — Kilrush, Clare","region_label":"1330404","unit":"count","geography_id":"lea:1330404","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":28.0,"data_refreshed_at":"2026-10-11T06:33:12.453622+00:00","prev_period_pct":180.0,"year_on_year_pct":21.73913043478261,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1340400","display_name":"New dwelling completions — Kanturk, Cork County","region_label":"1340400","unit":"count","geography_id":"lea:1340400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":21.0,"data_refreshed_at":"2026-10-11T06:33:14.025696+00:00","prev_period_pct":-36.36363636363637,"year_on_year_pct":40.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1340401","display_name":"New dwelling completions — Fermoy, Cork County","region_label":"1340401","unit":"count","geography_id":"lea:1340401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":19.0,"data_refreshed_at":"2026-10-11T06:33:15.594650+00:00","prev_period_pct":-66.66666666666666,"year_on_year_pct":-62.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1340402","display_name":"New dwelling completions — Midleton, Cork County","region_label":"1340402","unit":"count","geography_id":"lea:1340402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":82.0,"data_refreshed_at":"2026-10-11T06:33:17.164798+00:00","prev_period_pct":-34.4,"year_on_year_pct":-11.827956989247312,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1340403","display_name":"New dwelling completions — Carrigaline, Cork County","region_label":"1340403","unit":"count","geography_id":"lea:1340403","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":43.0,"data_refreshed_at":"2026-10-11T06:33:18.733941+00:00","prev_period_pct":65.38461538461539,"year_on_year_pct":-4.444444444444445,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1340404","display_name":"New dwelling completions — Cobh, Cork County","region_label":"1340404","unit":"count","geography_id":"lea:1340404","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":145.0,"data_refreshed_at":"2026-10-11T06:33:20.304654+00:00","prev_period_pct":28.31858407079646,"year_on_year_pct":93.33333333333333,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1340405","display_name":"New dwelling completions — Bandon-Kinsale, Cork County","region_label":"1340405","unit":"count","geography_id":"lea:1340405","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":81.0,"data_refreshed_at":"2026-10-11T06:33:21.866541+00:00","prev_period_pct":-16.49484536082474,"year_on_year_pct":22.727272727272727,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1340406","display_name":"New dwelling completions — Bantry-West Cork, Cork County","region_label":"1340406","unit":"count","geography_id":"lea:1340406","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":17.0,"data_refreshed_at":"2026-10-11T06:33:23.428633+00:00","prev_period_pct":-50.0,"year_on_year_pct":-10.526315789473683,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1340407","display_name":"New dwelling completions — Skibbereen-West Cork, Cork County","region_label":"1340407","unit":"count","geography_id":"lea:1340407","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":25.0,"data_refreshed_at":"2026-10-11T06:33:25.000393+00:00","prev_period_pct":-24.242424242424242,"year_on_year_pct":-13.793103448275861,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1340408","display_name":"New dwelling completions — Macroom, Cork County","region_label":"1340408","unit":"count","geography_id":"lea:1340408","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":40.0,"data_refreshed_at":"2026-10-11T06:33:26.578977+00:00","prev_period_pct":-61.904761904761905,"year_on_year_pct":-55.0561797752809,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1340409","display_name":"New dwelling completions — Mallow, Cork County","region_label":"1340409","unit":"count","geography_id":"lea:1340409","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":36.0,"data_refreshed_at":"2026-10-11T06:33:28.142607+00:00","prev_period_pct":71.42857142857143,"year_on_year_pct":50.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1340410","display_name":"New dwelling completions — Cork City North West, Cork City","region_label":"1340410","unit":"count","geography_id":"lea:1340410","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":66.0,"data_refreshed_at":"2026-10-11T06:33:29.703943+00:00","prev_period_pct":-38.31775700934579,"year_on_year_pct":164.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1340411","display_name":"New dwelling completions — Cork City North East, Cork City","region_label":"1340411","unit":"count","geography_id":"lea:1340411","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":183.0,"data_refreshed_at":"2026-10-11T06:33:31.263456+00:00","prev_period_pct":30.714285714285715,"year_on_year_pct":41.86046511627907,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1340412","display_name":"New dwelling completions — Cork City South East, Cork City","region_label":"1340412","unit":"count","geography_id":"lea:1340412","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":87.0,"data_refreshed_at":"2026-10-11T06:33:32.827848+00:00","prev_period_pct":-4.395604395604396,"year_on_year_pct":55.35714285714286,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1340413","display_name":"New dwelling completions — Cork City South Central, Cork City","region_label":"1340413","unit":"count","geography_id":"lea:1340413","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":19.0,"data_refreshed_at":"2026-10-11T06:33:34.394932+00:00","prev_period_pct":-38.70967741935484,"year_on_year_pct":-9.523809523809524,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1340414","display_name":"New dwelling completions — Cork City South West, Cork City","region_label":"1340414","unit":"count","geography_id":"lea:1340414","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":35.0,"data_refreshed_at":"2026-10-11T06:33:35.964660+00:00","prev_period_pct":-10.256410256410255,"year_on_year_pct":-63.541666666666664,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1350400","display_name":"New dwelling completions — Glenties, Donegal","region_label":"1350400","unit":"count","geography_id":"lea:1350400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":34.0,"data_refreshed_at":"2026-10-11T06:33:37.588978+00:00","prev_period_pct":9.67741935483871,"year_on_year_pct":0.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1350401","display_name":"New dwelling completions — Milford, Donegal","region_label":"1350401","unit":"count","geography_id":"lea:1350401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":15.0,"data_refreshed_at":"2026-10-11T06:33:39.153006+00:00","prev_period_pct":-11.76470588235294,"year_on_year_pct":-11.76470588235294,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1350402","display_name":"New dwelling completions — Carndonagh, Donegal","region_label":"1350402","unit":"count","geography_id":"lea:1350402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":34.0,"data_refreshed_at":"2026-10-11T06:33:40.721077+00:00","prev_period_pct":30.76923076923077,"year_on_year_pct":183.33333333333331,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1350403","display_name":"New dwelling completions — Buncrana, Donegal","region_label":"1350403","unit":"count","geography_id":"lea:1350403","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":16.0,"data_refreshed_at":"2026-10-11T06:33:42.287296+00:00","prev_period_pct":-15.789473684210526,"year_on_year_pct":-5.88235294117647,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1350404","display_name":"New dwelling completions — Donegal, Donegal","region_label":"1350404","unit":"count","geography_id":"lea:1350404","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":21.0,"data_refreshed_at":"2026-10-11T06:33:43.852509+00:00","prev_period_pct":-57.99999999999999,"year_on_year_pct":-19.230769230769234,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1350405","display_name":"New dwelling completions — Letterkenny, Donegal","region_label":"1350405","unit":"count","geography_id":"lea:1350405","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":53.0,"data_refreshed_at":"2026-10-11T06:33:45.415181+00:00","prev_period_pct":-24.285714285714285,"year_on_year_pct":211.76470588235296,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1350406","display_name":"New dwelling completions — Lifford-Stranorlar, Donegal","region_label":"1350406","unit":"count","geography_id":"lea:1350406","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":31.0,"data_refreshed_at":"2026-10-11T06:33:46.980698+00:00","prev_period_pct":93.75,"year_on_year_pct":19.230769230769234,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1360400","display_name":"New dwelling completions — Conamara North, Galway County","region_label":"1360400","unit":"count","geography_id":"lea:1360400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":23.0,"data_refreshed_at":"2026-10-11T06:33:48.541857+00:00","prev_period_pct":9.523809523809524,"year_on_year_pct":53.333333333333336,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1360401","display_name":"New dwelling completions — Tuam, Galway County","region_label":"1360401","unit":"count","geography_id":"lea:1360401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":29.0,"data_refreshed_at":"2026-10-11T06:33:50.111300+00:00","prev_period_pct":-29.268292682926827,"year_on_year_pct":3.571428571428571,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1360402","display_name":"New dwelling completions — Ballinasloe, Galway County","region_label":"1360402","unit":"count","geography_id":"lea:1360402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":19.0,"data_refreshed_at":"2026-10-11T06:33:51.678272+00:00","prev_period_pct":-20.833333333333336,"year_on_year_pct":-5.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1360403","display_name":"New dwelling completions — Loughrea, Galway County","region_label":"1360403","unit":"count","geography_id":"lea:1360403","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":46.0,"data_refreshed_at":"2026-10-11T06:33:53.243608+00:00","prev_period_pct":58.620689655172406,"year_on_year_pct":53.333333333333336,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1360404","display_name":"New dwelling completions — Athenry-Oranmore, Galway County","region_label":"1360404","unit":"count","geography_id":"lea:1360404","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":36.0,"data_refreshed_at":"2026-10-11T06:33:54.812685+00:00","prev_period_pct":-40.98360655737705,"year_on_year_pct":-5.263157894736842,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1360405","display_name":"New dwelling completions — Gort-Kinvara, Galway County","region_label":"1360405","unit":"count","geography_id":"lea:1360405","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":55.0,"data_refreshed_at":"2026-10-11T06:33:56.379718+00:00","prev_period_pct":-14.0625,"year_on_year_pct":5.769230769230769,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1360406","display_name":"New dwelling completions — Conamara South, Galway County","region_label":"1360406","unit":"count","geography_id":"lea:1360406","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":29.0,"data_refreshed_at":"2026-10-11T06:33:57.945891+00:00","prev_period_pct":38.095238095238095,"year_on_year_pct":-21.62162162162162,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1360420","display_name":"New dwelling completions — Galway City West, Galway City","region_label":"1360420","unit":"count","geography_id":"lea:1360420","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":35.0,"data_refreshed_at":"2026-10-11T06:33:59.539500+00:00","prev_period_pct":16.666666666666664,"year_on_year_pct":25.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1360421","display_name":"New dwelling completions — Galway City Central, Galway City","region_label":"1360421","unit":"count","geography_id":"lea:1360421","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":2.0,"data_refreshed_at":"2026-10-11T06:34:01.118207+00:00","prev_period_pct":-97.10144927536231,"year_on_year_pct":-90.9090909090909,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1360422","display_name":"New dwelling completions — Galway City East, Galway City","region_label":"1360422","unit":"count","geography_id":"lea:1360422","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":4.0,"data_refreshed_at":"2026-10-11T06:34:02.698130+00:00","prev_period_pct":0.0,"year_on_year_pct":-91.66666666666666,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1370400","display_name":"New dwelling completions — Listowel, Kerry","region_label":"1370400","unit":"count","geography_id":"lea:1370400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":8.0,"data_refreshed_at":"2026-10-11T06:34:04.279833+00:00","prev_period_pct":-63.63636363636363,"year_on_year_pct":-33.33333333333333,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1370401","display_name":"New dwelling completions — Castleisland, Kerry","region_label":"1370401","unit":"count","geography_id":"lea:1370401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":11.0,"data_refreshed_at":"2026-10-11T06:34:05.889678+00:00","prev_period_pct":37.5,"year_on_year_pct":37.5,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1370402","display_name":"New dwelling completions — Killarney, Kerry","region_label":"1370402","unit":"count","geography_id":"lea:1370402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":71.0,"data_refreshed_at":"2026-10-11T06:34:07.461253+00:00","prev_period_pct":4.411764705882353,"year_on_year_pct":-41.32231404958678,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1370403","display_name":"New dwelling completions — Kenmare, Kerry","region_label":"1370403","unit":"count","geography_id":"lea:1370403","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":39.0,"data_refreshed_at":"2026-10-11T06:34:09.192480+00:00","prev_period_pct":30.0,"year_on_year_pct":-7.142857142857142,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1370404","display_name":"New dwelling completions — Corca Dhuibhne, Kerry","region_label":"1370404","unit":"count","geography_id":"lea:1370404","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":28.0,"data_refreshed_at":"2026-10-11T06:34:10.766127+00:00","prev_period_pct":-34.883720930232556,"year_on_year_pct":133.33333333333331,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1370405","display_name":"New dwelling completions — Tralee, Kerry","region_label":"1370405","unit":"count","geography_id":"lea:1370405","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":36.0,"data_refreshed_at":"2026-10-11T06:34:12.350734+00:00","prev_period_pct":20.0,"year_on_year_pct":28.57142857142857,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1380400","display_name":"New dwelling completions — Maynooth, Kildare","region_label":"1380400","unit":"count","geography_id":"lea:1380400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":29.0,"data_refreshed_at":"2026-10-11T06:34:13.931013+00:00","prev_period_pct":-32.55813953488372,"year_on_year_pct":-27.500000000000004,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1380401","display_name":"New dwelling completions — Celbridge, Kildare","region_label":"1380401","unit":"count","geography_id":"lea:1380401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":48.0,"data_refreshed_at":"2026-10-11T06:34:15.523207+00:00","prev_period_pct":-47.25274725274725,"year_on_year_pct":300.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1380402","display_name":"New dwelling completions — Naas, Kildare","region_label":"1380402","unit":"count","geography_id":"lea:1380402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":79.0,"data_refreshed_at":"2026-10-11T06:34:17.110554+00:00","prev_period_pct":1.282051282051282,"year_on_year_pct":-28.18181818181818,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1380403","display_name":"New dwelling completions — Athy, Kildare","region_label":"1380403","unit":"count","geography_id":"lea:1380403","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":106.0,"data_refreshed_at":"2026-10-11T06:34:18.678182+00:00","prev_period_pct":49.29577464788733,"year_on_year_pct":863.6363636363636,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1380404","display_name":"New dwelling completions — Kildare, Kildare","region_label":"1380404","unit":"count","geography_id":"lea:1380404","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":49.0,"data_refreshed_at":"2026-10-11T06:34:20.249433+00:00","prev_period_pct":-22.22222222222222,"year_on_year_pct":-38.75,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1380405","display_name":"New dwelling completions — Clane, Kildare","region_label":"1380405","unit":"count","geography_id":"lea:1380405","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":73.0,"data_refreshed_at":"2026-10-11T06:34:21.821871+00:00","prev_period_pct":102.77777777777777,"year_on_year_pct":78.04878048780488,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1380406","display_name":"New dwelling completions — Leixlip, Kildare","region_label":"1380406","unit":"count","geography_id":"lea:1380406","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":81.0,"data_refreshed_at":"2026-10-11T06:34:23.389007+00:00","prev_period_pct":72.3404255319149,"year_on_year_pct":145.45454545454547,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1380407","display_name":"New dwelling completions — Newbridge, Kildare","region_label":"1380407","unit":"count","geography_id":"lea:1380407","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":127.0,"data_refreshed_at":"2026-10-11T06:34:24.959221+00:00","prev_period_pct":67.10526315789474,"year_on_year_pct":62.82051282051282,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1390400","display_name":"New dwelling completions — Castlecomer, Kilkenny","region_label":"1390400","unit":"count","geography_id":"lea:1390400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":24.0,"data_refreshed_at":"2026-10-11T06:34:26.528281+00:00","prev_period_pct":-27.27272727272727,"year_on_year_pct":-31.428571428571427,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1390401","display_name":"New dwelling completions — Kilkenny, Kilkenny","region_label":"1390401","unit":"count","geography_id":"lea:1390401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":45.0,"data_refreshed_at":"2026-10-11T06:34:28.102926+00:00","prev_period_pct":-39.189189189189186,"year_on_year_pct":-27.419354838709676,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1390402","display_name":"New dwelling completions — Piltown, Kilkenny","region_label":"1390402","unit":"count","geography_id":"lea:1390402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":67.0,"data_refreshed_at":"2026-10-11T06:34:29.679972+00:00","prev_period_pct":235.0,"year_on_year_pct":318.75,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1390403","display_name":"New dwelling completions — Callan-Thomastown, Kilkenny","region_label":"1390403","unit":"count","geography_id":"lea:1390403","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":36.0,"data_refreshed_at":"2026-10-11T06:34:31.247745+00:00","prev_period_pct":-14.285714285714285,"year_on_year_pct":56.52173913043478,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions:carlow-county-council","display_name":"New dwelling completions — carlow-county-council","region_label":"carlow-county-council","unit":"count","geography_id":"la:carlow-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":99.0,"data_refreshed_at":"2026-10-11T06:27:37.004811+00:00","prev_period_pct":29.411764705882355,"year_on_year_pct":90.38461538461539,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_carlow-county-council","label":"Single house","latest_value":22.0,"year_on_year_pct":57.14285714285714,"unit":"count","display_name":"Single house — Carlow County Council","region_label":"carlow-county-council","geography_id":"la:carlow-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:27:37.004811+00:00","prev_period_pct":29.411764705882355,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_carlow-county-council","label":"Scheme house","latest_value":75.0,"year_on_year_pct":141.93548387096774,"unit":"count","display_name":"Scheme house — Carlow County Council","region_label":"carlow-county-council","geography_id":"la:carlow-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:28:28.420996+00:00","prev_period_pct":167.85714285714286,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_carlow-county-council","label":"Apartment","latest_value":2.0,"year_on_year_pct":-71.42857142857143,"unit":"count","display_name":"Apartment — Carlow County Council","region_label":"carlow-county-council","geography_id":"la:carlow-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:29:19.758372+00:00","prev_period_pct":-50.0,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:cavan-county-council","display_name":"New dwelling completions — cavan-county-council","region_label":"cavan-county-council","unit":"count","geography_id":"la:cavan-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":108.0,"data_refreshed_at":"2026-10-11T06:27:38.665363+00:00","prev_period_pct":-17.073170731707318,"year_on_year_pct":35.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_cavan-county-council","label":"Single house","latest_value":34.0,"year_on_year_pct":13.333333333333334,"unit":"count","display_name":"Single house — Cavan County Council","region_label":"cavan-county-council","geography_id":"la:cavan-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:27:38.665363+00:00","prev_period_pct":-17.073170731707318,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_cavan-county-council","label":"Scheme house","latest_value":68.0,"year_on_year_pct":134.48275862068965,"unit":"count","display_name":"Scheme house — Cavan County Council","region_label":"cavan-county-council","geography_id":"la:cavan-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:28:30.070244+00:00","prev_period_pct":126.66666666666666,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_cavan-county-council","label":"Apartment","latest_value":6.0,"year_on_year_pct":-71.42857142857143,"unit":"count","display_name":"Apartment — Cavan County Council","region_label":"cavan-county-council","geography_id":"la:cavan-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:29:21.413045+00:00","prev_period_pct":50.0,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:clare-county-council","display_name":"New dwelling completions — clare-county-council","region_label":"clare-county-council","unit":"count","geography_id":"la:clare-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":178.0,"data_refreshed_at":"2026-10-11T06:27:40.330621+00:00","prev_period_pct":17.24137931034483,"year_on_year_pct":-4.81283422459893,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_clare-county-council","label":"Single house","latest_value":68.0,"year_on_year_pct":-17.073170731707318,"unit":"count","display_name":"Single house — Clare County Council","region_label":"clare-county-council","geography_id":"la:clare-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:27:40.330621+00:00","prev_period_pct":17.24137931034483,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_clare-county-council","label":"Scheme house","latest_value":93.0,"year_on_year_pct":10.714285714285714,"unit":"count","display_name":"Scheme house — Clare County Council","region_label":"clare-county-council","geography_id":"la:clare-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:28:31.727127+00:00","prev_period_pct":0.0,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_clare-county-council","label":"Apartment","latest_value":17.0,"year_on_year_pct":-19.047619047619047,"unit":"count","display_name":"Apartment — Clare County Council","region_label":"clare-county-council","geography_id":"la:clare-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:29:23.068249+00:00","prev_period_pct":null,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:cork-city-council","display_name":"New dwelling completions — cork-city-council","region_label":"cork-city-council","unit":"count","geography_id":"la:cork-city-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":390.0,"data_refreshed_at":"2026-10-11T06:27:41.980399+00:00","prev_period_pct":-7.142857142857142,"year_on_year_pct":19.26605504587156,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_cork-city-council","label":"Single house","latest_value":13.0,"year_on_year_pct":-13.333333333333334,"unit":"count","display_name":"Single house — Cork City Council","region_label":"cork-city-council","geography_id":"la:cork-city-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:27:41.980399+00:00","prev_period_pct":-7.142857142857142,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_cork-city-council","label":"Scheme house","latest_value":251.0,"year_on_year_pct":-7.720588235294118,"unit":"count","display_name":"Scheme house — Cork City Council","region_label":"cork-city-council","geography_id":"la:cork-city-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:28:33.380274+00:00","prev_period_pct":-14.334470989761092,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_cork-city-council","label":"Apartment","latest_value":126.0,"year_on_year_pct":215.0,"unit":"count","display_name":"Apartment — Cork City Council","region_label":"cork-city-council","geography_id":"la:cork-city-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:29:24.717948+00:00","prev_period_pct":24.752475247524753,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:cork-county-council","display_name":"New dwelling completions — cork-county-council","region_label":"cork-county-council","unit":"count","geography_id":"la:cork-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":509.0,"data_refreshed_at":"2026-10-11T06:27:43.634303+00:00","prev_period_pct":13.013698630136986,"year_on_year_pct":-0.19607843137254902,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_cork-county-council","label":"Single house","latest_value":165.0,"year_on_year_pct":10.0,"unit":"count","display_name":"Single house — Cork County Council","region_label":"cork-county-council","geography_id":"la:cork-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:27:43.634303+00:00","prev_period_pct":13.013698630136986,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_cork-county-council","label":"Scheme house","latest_value":330.0,"year_on_year_pct":-4.069767441860465,"unit":"count","display_name":"Scheme house — Cork County Council","region_label":"cork-county-council","geography_id":"la:cork-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:28:35.038686+00:00","prev_period_pct":-30.962343096234306,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_cork-county-council","label":"Apartment","latest_value":14.0,"year_on_year_pct":-12.5,"unit":"count","display_name":"Apartment — Cork County Council","region_label":"cork-county-council","geography_id":"la:cork-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:29:26.371226+00:00","prev_period_pct":-30.0,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:donegal-county-council","display_name":"New dwelling completions — donegal-county-council","region_label":"donegal-county-council","unit":"count","geography_id":"la:donegal-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":204.0,"data_refreshed_at":"2026-10-11T06:27:45.289675+00:00","prev_period_pct":9.574468085106384,"year_on_year_pct":32.467532467532465,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_donegal-county-council","label":"Single house","latest_value":103.0,"year_on_year_pct":-14.166666666666666,"unit":"count","display_name":"Single house — Donegal County Council","region_label":"donegal-county-council","geography_id":"la:donegal-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:27:45.289675+00:00","prev_period_pct":9.574468085106384,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_donegal-county-council","label":"Scheme house","latest_value":95.0,"year_on_year_pct":239.28571428571428,"unit":"count","display_name":"Scheme house — Donegal County Council","region_label":"donegal-county-council","geography_id":"la:donegal-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:28:36.691616+00:00","prev_period_pct":-27.480916030534353,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_donegal-county-council","label":"Apartment","latest_value":6.0,"year_on_year_pct":0.0,"unit":"count","display_name":"Apartment — Donegal County Council","region_label":"donegal-county-council","geography_id":"la:donegal-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:29:28.024501+00:00","prev_period_pct":50.0,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:dublin-city-council","display_name":"New dwelling completions — dublin-city-council","region_label":"dublin-city-council","unit":"count","geography_id":"la:dublin-city-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":1280.0,"data_refreshed_at":"2026-10-11T06:27:46.946286+00:00","prev_period_pct":0.0,"year_on_year_pct":11.401218450826828,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_dublin-city-council","label":"Single house","latest_value":19.0,"year_on_year_pct":-17.391304347826086,"unit":"count","display_name":"Single house — Dublin City Council","region_label":"dublin-city-council","geography_id":"la:dublin-city-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:27:46.946286+00:00","prev_period_pct":0.0,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_dublin-city-council","label":"Scheme house","latest_value":91.0,"year_on_year_pct":435.2941176470588,"unit":"count","display_name":"Scheme house — Dublin City Council","region_label":"dublin-city-council","geography_id":"la:dublin-city-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:28:38.344595+00:00","prev_period_pct":213.79310344827584,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_dublin-city-council","label":"Apartment","latest_value":1170.0,"year_on_year_pct":5.500450856627593,"unit":"count","display_name":"Apartment — Dublin City Council","region_label":"dublin-city-council","geography_id":"la:dublin-city-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:29:29.683803+00:00","prev_period_pct":21.243523316062177,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:dun-laoghaire-rathdown-county-council","display_name":"New dwelling completions — dun-laoghaire-rathdown-county-council","region_label":"dun-laoghaire-rathdown-county-council","unit":"count","geography_id":"la:dun-laoghaire-rathdown-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":307.0,"data_refreshed_at":"2026-10-11T06:27:48.606445+00:00","prev_period_pct":-42.857142857142854,"year_on_year_pct":-62.87787182587666,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_dun-laoghaire-rathdown-county-council","label":"Single house","latest_value":8.0,"year_on_year_pct":-38.46153846153847,"unit":"count","display_name":"Single house — Dún Laoghaire Rathdown County Council","region_label":"dun-laoghaire-rathdown-county-council","geography_id":"la:dun-laoghaire-rathdown-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:27:48.606445+00:00","prev_period_pct":-42.857142857142854,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_dun-laoghaire-rathdown-county-council","label":"Scheme house","latest_value":85.0,"year_on_year_pct":-38.405797101449274,"unit":"count","display_name":"Scheme house — Dún Laoghaire Rathdown County Council","region_label":"dun-laoghaire-rathdown-county-council","geography_id":"la:dun-laoghaire-rathdown-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:28:39.994276+00:00","prev_period_pct":2.4096385542168677,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_dun-laoghaire-rathdown-county-council","label":"Apartment","latest_value":214.0,"year_on_year_pct":-68.34319526627219,"unit":"count","display_name":"Apartment — Dún Laoghaire Rathdown County Council","region_label":"dun-laoghaire-rathdown-county-council","geography_id":"la:dun-laoghaire-rathdown-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:29:31.333962+00:00","prev_period_pct":-15.079365079365079,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:fingal-county-council","display_name":"New dwelling completions — fingal-county-council","region_label":"fingal-county-council","unit":"count","geography_id":"la:fingal-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":1020.0,"data_refreshed_at":"2026-10-11T06:27:50.264132+00:00","prev_period_pct":15.384615384615385,"year_on_year_pct":-15.070774354704414,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_fingal-county-council","label":"Single house","latest_value":15.0,"year_on_year_pct":-34.78260869565217,"unit":"count","display_name":"Single house — Fingal County Council","region_label":"fingal-county-council","geography_id":"la:fingal-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:27:50.264132+00:00","prev_period_pct":15.384615384615385,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_fingal-county-council","label":"Scheme house","latest_value":551.0,"year_on_year_pct":-29.08622908622909,"unit":"count","display_name":"Scheme house — Fingal County Council","region_label":"fingal-county-council","geography_id":"la:fingal-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:28:41.647722+00:00","prev_period_pct":159.9056603773585,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_fingal-county-council","label":"Apartment","latest_value":454.0,"year_on_year_pct":13.216957605985039,"unit":"count","display_name":"Apartment — Fingal County Council","region_label":"fingal-county-council","geography_id":"la:fingal-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:29:32.990995+00:00","prev_period_pct":119.32367149758454,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:galway-city-council","display_name":"New dwelling completions — galway-city-council","region_label":"galway-city-council","unit":"count","geography_id":"la:galway-city-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":41.0,"data_refreshed_at":"2026-10-11T06:27:51.919245+00:00","prev_period_pct":-30.0,"year_on_year_pct":-58.16326530612245,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_galway-city-council","label":"Single house","latest_value":7.0,"year_on_year_pct":-22.22222222222222,"unit":"count","display_name":"Single house — Galway City Council","region_label":"galway-city-council","geography_id":"la:galway-city-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:27:51.919245+00:00","prev_period_pct":-30.0,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_galway-city-council","label":"Scheme house","latest_value":16.0,"year_on_year_pct":-60.0,"unit":"count","display_name":"Scheme house — Galway City Council","region_label":"galway-city-council","geography_id":"la:galway-city-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:28:43.304639+00:00","prev_period_pct":-63.63636363636363,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_galway-city-council","label":"Apartment","latest_value":18.0,"year_on_year_pct":-63.26530612244898,"unit":"count","display_name":"Apartment — Galway City Council","region_label":"galway-city-council","geography_id":"la:galway-city-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:29:34.644774+00:00","prev_period_pct":-63.26530612244898,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:galway-county-council","display_name":"New dwelling completions — galway-county-council","region_label":"galway-county-council","unit":"count","geography_id":"la:galway-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":237.0,"data_refreshed_at":"2026-10-11T06:27:53.589990+00:00","prev_period_pct":3.2520325203252036,"year_on_year_pct":7.727272727272727,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_galway-county-council","label":"Single house","latest_value":127.0,"year_on_year_pct":4.098360655737705,"unit":"count","display_name":"Single house — Galway County Council","region_label":"galway-county-council","geography_id":"la:galway-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:27:53.589990+00:00","prev_period_pct":3.2520325203252036,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_galway-county-council","label":"Scheme house","latest_value":75.0,"year_on_year_pct":-19.35483870967742,"unit":"count","display_name":"Scheme house — Galway County Council","region_label":"galway-county-council","geography_id":"la:galway-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:28:44.956165+00:00","prev_period_pct":-31.818181818181817,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_galway-county-council","label":"Apartment","latest_value":35.0,"year_on_year_pct":600.0,"unit":"count","display_name":"Apartment — Galway County Council","region_label":"galway-county-council","geography_id":"la:galway-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:29:36.297866+00:00","prev_period_pct":25.0,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:kerry-county-council","display_name":"New dwelling completions — kerry-county-council","region_label":"kerry-county-council","unit":"count","geography_id":"la:kerry-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":193.0,"data_refreshed_at":"2026-10-11T06:27:55.249381+00:00","prev_period_pct":-12.857142857142856,"year_on_year_pct":-12.66968325791854,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_kerry-county-council","label":"Single house","latest_value":61.0,"year_on_year_pct":-6.153846153846154,"unit":"count","display_name":"Single house — Kerry County Council","region_label":"kerry-county-council","geography_id":"la:kerry-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:27:55.249381+00:00","prev_period_pct":-12.857142857142856,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_kerry-county-council","label":"Scheme house","latest_value":105.0,"year_on_year_pct":-32.25806451612903,"unit":"count","display_name":"Scheme house — Kerry County Council","region_label":"kerry-county-council","geography_id":"la:kerry-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:28:46.613908+00:00","prev_period_pct":-16.0,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_kerry-county-council","label":"Apartment","latest_value":27.0,"year_on_year_pct":2600.0,"unit":"count","display_name":"Apartment — Kerry County Council","region_label":"kerry-county-council","geography_id":"la:kerry-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:29:37.958236+00:00","prev_period_pct":350.0,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:kildare-county-council","display_name":"New dwelling completions — kildare-county-council","region_label":"kildare-county-council","unit":"count","geography_id":"la:kildare-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":592.0,"data_refreshed_at":"2026-10-11T06:27:56.904283+00:00","prev_period_pct":2.4390243902439024,"year_on_year_pct":45.45454545454545,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_kildare-county-council","label":"Single house","latest_value":42.0,"year_on_year_pct":-23.636363636363637,"unit":"count","display_name":"Single house — Kildare County Council","region_label":"kildare-county-council","geography_id":"la:kildare-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:27:56.904283+00:00","prev_period_pct":2.4390243902439024,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_kildare-county-council","label":"Scheme house","latest_value":418.0,"year_on_year_pct":30.625000000000004,"unit":"count","display_name":"Scheme house — Kildare County Council","region_label":"kildare-county-council","geography_id":"la:kildare-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:28:48.267907+00:00","prev_period_pct":-1.647058823529412,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_kildare-county-council","label":"Apartment","latest_value":132.0,"year_on_year_pct":312.5,"unit":"count","display_name":"Apartment — Kildare County Council","region_label":"kildare-county-council","geography_id":"la:kildare-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:29:39.610363+00:00","prev_period_pct":238.46153846153845,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:kilkenny-county-council","display_name":"New dwelling completions — kilkenny-county-council","region_label":"kilkenny-county-council","unit":"count","geography_id":"la:kilkenny-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":172.0,"data_refreshed_at":"2026-10-11T06:27:58.573945+00:00","prev_period_pct":26.666666666666668,"year_on_year_pct":20.27972027972028,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_kilkenny-county-council","label":"Single house","latest_value":57.0,"year_on_year_pct":29.545454545454547,"unit":"count","display_name":"Single house — Kilkenny County Council","region_label":"kilkenny-county-council","geography_id":"la:kilkenny-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:27:58.573945+00:00","prev_period_pct":26.666666666666668,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_kilkenny-county-council","label":"Scheme house","latest_value":112.0,"year_on_year_pct":28.735632183908045,"unit":"count","display_name":"Scheme house — Kilkenny County Council","region_label":"kilkenny-county-council","geography_id":"la:kilkenny-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:28:49.923706+00:00","prev_period_pct":10.891089108910892,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_kilkenny-county-council","label":"Apartment","latest_value":3.0,"year_on_year_pct":-75.0,"unit":"count","display_name":"Apartment — Kilkenny County Council","region_label":"kilkenny-county-council","geography_id":"la:kilkenny-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:29:41.274567+00:00","prev_period_pct":-86.95652173913044,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:laois-county-council","display_name":"New dwelling completions — laois-county-council","region_label":"laois-county-council","unit":"count","geography_id":"la:laois-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":208.0,"data_refreshed_at":"2026-10-11T06:28:00.250134+00:00","prev_period_pct":13.513513513513514,"year_on_year_pct":-9.565217391304348,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_laois-county-council","label":"Single house","latest_value":42.0,"year_on_year_pct":7.6923076923076925,"unit":"count","display_name":"Single house — Laois County Council","region_label":"laois-county-council","geography_id":"la:laois-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:28:00.250134+00:00","prev_period_pct":13.513513513513514,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_laois-county-council","label":"Scheme house","latest_value":155.0,"year_on_year_pct":-14.835164835164836,"unit":"count","display_name":"Scheme house — Laois County Council","region_label":"laois-county-council","geography_id":"la:laois-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:28:51.583228+00:00","prev_period_pct":-18.421052631578945,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_laois-county-council","label":"Apartment","latest_value":11.0,"year_on_year_pct":22.22222222222222,"unit":"count","display_name":"Apartment — Laois County Council","region_label":"laois-county-council","geography_id":"la:laois-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:29:42.924436+00:00","prev_period_pct":-31.25,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:leitrim-county-council","display_name":"New dwelling completions — leitrim-county-council","region_label":"leitrim-county-council","unit":"count","geography_id":"la:leitrim-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":32.0,"data_refreshed_at":"2026-10-11T06:28:01.908014+00:00","prev_period_pct":-25.0,"year_on_year_pct":-11.11111111111111,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_leitrim-county-council","label":"Single house","latest_value":12.0,"year_on_year_pct":-36.84210526315789,"unit":"count","display_name":"Single house — Leitrim County Council","region_label":"leitrim-county-council","geography_id":"la:leitrim-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:28:01.908014+00:00","prev_period_pct":-25.0,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_leitrim-county-council","label":"Scheme house","latest_value":14.0,"year_on_year_pct":27.27272727272727,"unit":"count","display_name":"Scheme house — Leitrim County Council","region_label":"leitrim-county-council","geography_id":"la:leitrim-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:28:53.238146+00:00","prev_period_pct":7.6923076923076925,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_leitrim-county-council","label":"Apartment","latest_value":6.0,"year_on_year_pct":0.0,"unit":"count","display_name":"Apartment — Leitrim County Council","region_label":"leitrim-county-council","geography_id":"la:leitrim-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:29:44.577667+00:00","prev_period_pct":50.0,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:limerick-city-and-county-council","display_name":"New dwelling completions — limerick-city-and-county-council","region_label":"limerick-city-and-county-council","unit":"count","geography_id":"la:limerick-city-and-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":185.0,"data_refreshed_at":"2026-10-11T06:28:03.567602+00:00","prev_period_pct":24.528301886792452,"year_on_year_pct":-16.289592760180984,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_limerick-city-and-county-council","label":"Single house","latest_value":66.0,"year_on_year_pct":-13.157894736842104,"unit":"count","display_name":"Single house — Limerick City & County Council","region_label":"limerick-city-and-county-council","geography_id":"la:limerick-city-and-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:28:03.567602+00:00","prev_period_pct":24.528301886792452,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_limerick-city-and-county-council","label":"Scheme house","latest_value":90.0,"year_on_year_pct":-32.33082706766917,"unit":"count","display_name":"Scheme house — Limerick City & County Council","region_label":"limerick-city-and-county-council","geography_id":"la:limerick-city-and-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:28:54.899957+00:00","prev_period_pct":36.36363636363637,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_limerick-city-and-county-council","label":"Apartment","latest_value":29.0,"year_on_year_pct":141.66666666666669,"unit":"count","display_name":"Apartment — Limerick City & County Council","region_label":"limerick-city-and-county-council","geography_id":"la:limerick-city-and-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:29:46.247635+00:00","prev_period_pct":38.095238095238095,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:longford-county-council","display_name":"New dwelling completions — longford-county-council","region_label":"longford-county-council","unit":"count","geography_id":"la:longford-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":64.0,"data_refreshed_at":"2026-10-11T06:28:05.226994+00:00","prev_period_pct":21.052631578947366,"year_on_year_pct":204.76190476190476,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_longford-county-council","label":"Single house","latest_value":23.0,"year_on_year_pct":35.294117647058826,"unit":"count","display_name":"Single house — Longford County Council","region_label":"longford-county-council","geography_id":"la:longford-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:28:05.226994+00:00","prev_period_pct":21.052631578947366,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_longford-county-council","label":"Scheme house","latest_value":38.0,"year_on_year_pct":850.0,"unit":"count","display_name":"Scheme house — Longford County Council","region_label":"longford-county-council","geography_id":"la:longford-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:28:56.554668+00:00","prev_period_pct":375.0,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_longford-county-council","label":"Apartment","latest_value":3.0,"year_on_year_pct":null,"unit":"count","display_name":"Apartment — Longford County Council","region_label":"longford-county-council","geography_id":"la:longford-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:29:47.899137+00:00","prev_period_pct":-50.0,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:louth-county-council","display_name":"New dwelling completions — louth-county-council","region_label":"louth-county-council","unit":"count","geography_id":"la:louth-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":476.0,"data_refreshed_at":"2026-10-11T06:28:06.891524+00:00","prev_period_pct":-25.0,"year_on_year_pct":14.148681055155876,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_louth-county-council","label":"Single house","latest_value":27.0,"year_on_year_pct":8.0,"unit":"count","display_name":"Single house — Louth County Council","region_label":"louth-county-council","geography_id":"la:louth-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:28:06.891524+00:00","prev_period_pct":-25.0,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_louth-county-council","label":"Scheme house","latest_value":384.0,"year_on_year_pct":51.77865612648221,"unit":"count","display_name":"Scheme house — Louth County Council","region_label":"louth-county-council","geography_id":"la:louth-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:28:58.205716+00:00","prev_period_pct":27.1523178807947,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_louth-county-council","label":"Apartment","latest_value":65.0,"year_on_year_pct":-53.23741007194245,"unit":"count","display_name":"Apartment — Louth County Council","region_label":"louth-county-council","geography_id":"la:louth-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:29:49.547680+00:00","prev_period_pct":-41.44144144144144,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:mayo-county-council","display_name":"New dwelling completions — mayo-county-council","region_label":"mayo-county-council","unit":"count","geography_id":"la:mayo-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":115.0,"data_refreshed_at":"2026-10-11T06:28:08.546425+00:00","prev_period_pct":-19.17808219178082,"year_on_year_pct":17.346938775510203,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_mayo-county-council","label":"Single house","latest_value":59.0,"year_on_year_pct":-9.230769230769232,"unit":"count","display_name":"Single house — Mayo County Council","region_label":"mayo-county-council","geography_id":"la:mayo-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:28:08.546425+00:00","prev_period_pct":-19.17808219178082,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_mayo-county-council","label":"Scheme house","latest_value":48.0,"year_on_year_pct":92.0,"unit":"count","display_name":"Scheme house — Mayo County Council","region_label":"mayo-county-council","geography_id":"la:mayo-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:28:59.865183+00:00","prev_period_pct":17.073170731707318,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_mayo-county-council","label":"Apartment","latest_value":8.0,"year_on_year_pct":0.0,"unit":"count","display_name":"Apartment — Mayo County Council","region_label":"mayo-county-council","geography_id":"la:mayo-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:29:51.204140+00:00","prev_period_pct":-50.0,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:meath-county-council","display_name":"New dwelling completions — meath-county-council","region_label":"meath-county-council","unit":"count","geography_id":"la:meath-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":461.0,"data_refreshed_at":"2026-10-11T06:28:10.197212+00:00","prev_period_pct":-1.4492753623188406,"year_on_year_pct":-4.356846473029045,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_meath-county-council","label":"Single house","latest_value":68.0,"year_on_year_pct":-9.333333333333334,"unit":"count","display_name":"Single house — Meath County Council","region_label":"meath-county-council","geography_id":"la:meath-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:28:10.197212+00:00","prev_period_pct":-1.4492753623188406,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_meath-county-council","label":"Scheme house","latest_value":358.0,"year_on_year_pct":-5.039787798408488,"unit":"count","display_name":"Scheme house — Meath County Council","region_label":"meath-county-council","geography_id":"la:meath-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:29:01.527449+00:00","prev_period_pct":109.35672514619883,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_meath-county-council","label":"Apartment","latest_value":35.0,"year_on_year_pct":16.666666666666664,"unit":"count","display_name":"Apartment — Meath County Council","region_label":"meath-county-council","geography_id":"la:meath-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:29:52.852134+00:00","prev_period_pct":483.3333333333333,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:monaghan-county-council","display_name":"New dwelling completions — monaghan-county-council","region_label":"monaghan-county-council","unit":"count","geography_id":"la:monaghan-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":92.0,"data_refreshed_at":"2026-10-11T06:28:11.854646+00:00","prev_period_pct":22.857142857142858,"year_on_year_pct":46.03174603174603,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_monaghan-county-council","label":"Single house","latest_value":43.0,"year_on_year_pct":13.157894736842104,"unit":"count","display_name":"Single house — Monaghan County Council","region_label":"monaghan-county-council","geography_id":"la:monaghan-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:28:11.854646+00:00","prev_period_pct":22.857142857142858,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_monaghan-county-council","label":"Scheme house","latest_value":45.0,"year_on_year_pct":87.5,"unit":"count","display_name":"Scheme house — Monaghan County Council","region_label":"monaghan-county-council","geography_id":"la:monaghan-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:29:03.179797+00:00","prev_period_pct":36.36363636363637,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_monaghan-county-council","label":"Apartment","latest_value":4.0,"year_on_year_pct":300.0,"unit":"count","display_name":"Apartment — Monaghan County Council","region_label":"monaghan-county-council","geography_id":"la:monaghan-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:29:54.500622+00:00","prev_period_pct":-63.63636363636363,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:offaly-county-council","display_name":"New dwelling completions — offaly-county-council","region_label":"offaly-county-council","unit":"count","geography_id":"la:offaly-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":145.0,"data_refreshed_at":"2026-10-11T06:28:13.523596+00:00","prev_period_pct":0.0,"year_on_year_pct":116.4179104477612,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_offaly-county-council","label":"Single house","latest_value":37.0,"year_on_year_pct":-17.77777777777778,"unit":"count","display_name":"Single house — Offaly County Council","region_label":"offaly-county-council","geography_id":"la:offaly-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:28:13.523596+00:00","prev_period_pct":0.0,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_offaly-county-council","label":"Scheme house","latest_value":91.0,"year_on_year_pct":506.66666666666663,"unit":"count","display_name":"Scheme house — Offaly County Council","region_label":"offaly-county-council","geography_id":"la:offaly-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:29:04.838126+00:00","prev_period_pct":355.0,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_offaly-county-council","label":"Apartment","latest_value":17.0,"year_on_year_pct":142.85714285714286,"unit":"count","display_name":"Apartment — Offaly County Council","region_label":"offaly-county-council","geography_id":"la:offaly-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:29:56.155667+00:00","prev_period_pct":750.0,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:roscommon-county-council","display_name":"New dwelling completions — roscommon-county-council","region_label":"roscommon-county-council","unit":"count","geography_id":"la:roscommon-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":74.0,"data_refreshed_at":"2026-10-11T06:28:15.185928+00:00","prev_period_pct":22.22222222222222,"year_on_year_pct":164.28571428571428,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_roscommon-county-council","label":"Single house","latest_value":33.0,"year_on_year_pct":37.5,"unit":"count","display_name":"Single house — Roscommon County Council","region_label":"roscommon-county-council","geography_id":"la:roscommon-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:28:15.185928+00:00","prev_period_pct":22.22222222222222,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_roscommon-county-council","label":"Scheme house","latest_value":36.0,"year_on_year_pct":null,"unit":"count","display_name":"Scheme house — Roscommon County Council","region_label":"roscommon-county-council","geography_id":"la:roscommon-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:29:06.501902+00:00","prev_period_pct":-5.263157894736842,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_roscommon-county-council","label":"Apartment","latest_value":5.0,"year_on_year_pct":25.0,"unit":"count","display_name":"Apartment — Roscommon County Council","region_label":"roscommon-county-council","geography_id":"la:roscommon-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:29:57.807971+00:00","prev_period_pct":66.66666666666666,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:sligo-county-council","display_name":"New dwelling completions — sligo-county-council","region_label":"sligo-county-council","unit":"count","geography_id":"la:sligo-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":112.0,"data_refreshed_at":"2026-10-11T06:28:16.838970+00:00","prev_period_pct":19.047619047619047,"year_on_year_pct":-22.758620689655174,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_sligo-county-council","label":"Single house","latest_value":25.0,"year_on_year_pct":0.0,"unit":"count","display_name":"Single house — Sligo County Council","region_label":"sligo-county-council","geography_id":"la:sligo-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:28:16.838970+00:00","prev_period_pct":19.047619047619047,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_sligo-county-council","label":"Scheme house","latest_value":85.0,"year_on_year_pct":-29.166666666666668,"unit":"count","display_name":"Scheme house — Sligo County Council","region_label":"sligo-county-council","geography_id":"la:sligo-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:29:08.159467+00:00","prev_period_pct":63.46153846153846,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_sligo-county-council","label":"Apartment","latest_value":2.0,"year_on_year_pct":null,"unit":"count","display_name":"Apartment — Sligo County Council","region_label":"sligo-county-council","geography_id":"la:sligo-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:29:59.542202+00:00","prev_period_pct":null,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:south-dublin-county-council","display_name":"New dwelling completions — south-dublin-county-council","region_label":"south-dublin-county-council","unit":"count","geography_id":"la:south-dublin-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":573.0,"data_refreshed_at":"2026-10-11T06:28:18.493924+00:00","prev_period_pct":-57.14285714285714,"year_on_year_pct":-8.466453674121405,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_south-dublin-county-council","label":"Single house","latest_value":6.0,"year_on_year_pct":-57.14285714285714,"unit":"count","display_name":"Single house — South Dublin County Council","region_label":"south-dublin-county-council","geography_id":"la:south-dublin-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:28:18.493924+00:00","prev_period_pct":-57.14285714285714,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_south-dublin-county-council","label":"Scheme house","latest_value":399.0,"year_on_year_pct":39.51048951048951,"unit":"count","display_name":"Scheme house — South Dublin County Council","region_label":"south-dublin-county-council","geography_id":"la:south-dublin-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:29:09.816808+00:00","prev_period_pct":23.91304347826087,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_south-dublin-county-council","label":"Apartment","latest_value":168.0,"year_on_year_pct":-48.466257668711656,"unit":"count","display_name":"Apartment — South Dublin County Council","region_label":"south-dublin-county-council","geography_id":"la:south-dublin-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:30:01.234853+00:00","prev_period_pct":-58.72235872235873,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:tipperary-county-council","display_name":"New dwelling completions — tipperary-county-council","region_label":"tipperary-county-council","unit":"count","geography_id":"la:tipperary-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":169.0,"data_refreshed_at":"2026-10-11T06:28:20.149209+00:00","prev_period_pct":-27.027027027027028,"year_on_year_pct":-19.52380952380951,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_tipperary-county-council","label":"Single house","latest_value":54.0,"year_on_year_pct":25.581395348837212,"unit":"count","display_name":"Single house — Tipperary County Council","region_label":"tipperary-county-council","geography_id":"la:tipperary-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:28:20.149209+00:00","prev_period_pct":-27.027027027027028,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_tipperary-county-council","label":"Scheme house","latest_value":92.0,"year_on_year_pct":-43.558282208588956,"unit":"count","display_name":"Scheme house — Tipperary County Council","region_label":"tipperary-county-council","geography_id":"la:tipperary-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:29:11.469677+00:00","prev_period_pct":-12.380952380952381,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_tipperary-county-council","label":"Apartment","latest_value":23.0,"year_on_year_pct":475.0,"unit":"count","display_name":"Apartment — Tipperary County Council","region_label":"tipperary-county-council","geography_id":"la:tipperary-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:30:02.987564+00:00","prev_period_pct":1050.0,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:waterford-city-and-county-council","display_name":"New dwelling completions — waterford-city-and-county-council","region_label":"waterford-city-and-county-council","unit":"count","geography_id":"la:waterford-city-and-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":151.0,"data_refreshed_at":"2026-10-11T06:28:21.803553+00:00","prev_period_pct":25.806451612903224,"year_on_year_pct":12.686567164179104,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_waterford-city-and-county-council","label":"Single house","latest_value":39.0,"year_on_year_pct":-20.408163265306122,"unit":"count","display_name":"Single house — Waterford City & County Council","region_label":"waterford-city-and-county-council","geography_id":"la:waterford-city-and-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:28:21.803553+00:00","prev_period_pct":25.806451612903224,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_waterford-city-and-county-council","label":"Scheme house","latest_value":102.0,"year_on_year_pct":32.467532467532465,"unit":"count","display_name":"Scheme house — Waterford City & County Council","region_label":"waterford-city-and-county-council","geography_id":"la:waterford-city-and-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:29:13.123183+00:00","prev_period_pct":-26.08695652173913,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_waterford-city-and-county-council","label":"Apartment","latest_value":10.0,"year_on_year_pct":25.0,"unit":"count","display_name":"Apartment — Waterford City & County Council","region_label":"waterford-city-and-county-council","geography_id":"la:waterford-city-and-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:30:04.646495+00:00","prev_period_pct":25.0,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:westmeath-county-council","display_name":"New dwelling completions — westmeath-county-council","region_label":"westmeath-county-council","unit":"count","geography_id":"la:westmeath-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":168.0,"data_refreshed_at":"2026-10-11T06:28:23.455133+00:00","prev_period_pct":73.33333333333333,"year_on_year_pct":-28.813559322033903,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_westmeath-county-council","label":"Single house","latest_value":52.0,"year_on_year_pct":13.043478260869565,"unit":"count","display_name":"Single house — Westmeath County Council","region_label":"westmeath-county-council","geography_id":"la:westmeath-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:28:23.455133+00:00","prev_period_pct":73.33333333333333,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_westmeath-county-council","label":"Scheme house","latest_value":101.0,"year_on_year_pct":-39.88095238095239,"unit":"count","display_name":"Scheme house — Westmeath County Council","region_label":"westmeath-county-council","geography_id":"la:westmeath-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:29:14.782954+00:00","prev_period_pct":274.0740740740741,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_westmeath-county-council","label":"Apartment","latest_value":15.0,"year_on_year_pct":-31.818181818181817,"unit":"count","display_name":"Apartment — Westmeath County Council","region_label":"westmeath-county-council","geography_id":"la:westmeath-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:30:06.302542+00:00","prev_period_pct":null,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:wexford-county-council","display_name":"New dwelling completions — wexford-county-council","region_label":"wexford-county-council","unit":"count","geography_id":"la:wexford-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":270.0,"data_refreshed_at":"2026-10-11T06:28:25.106422+00:00","prev_period_pct":-21.333333333333336,"year_on_year_pct":-6.5743944636678195,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_wexford-county-council","label":"Single house","latest_value":59.0,"year_on_year_pct":-22.36842105263158,"unit":"count","display_name":"Single house — Wexford County Council","region_label":"wexford-county-council","geography_id":"la:wexford-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:28:25.106422+00:00","prev_period_pct":-21.333333333333336,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_wexford-county-council","label":"Scheme house","latest_value":194.0,"year_on_year_pct":-0.5128205128205128,"unit":"count","display_name":"Scheme house — Wexford County Council","region_label":"wexford-county-council","geography_id":"la:wexford-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:29:16.445834+00:00","prev_period_pct":-1.5228426395939088,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_wexford-county-council","label":"Apartment","latest_value":17.0,"year_on_year_pct":-5.555555555555555,"unit":"count","display_name":"Apartment — Wexford County Council","region_label":"wexford-county-council","geography_id":"la:wexford-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:30:07.965006+00:00","prev_period_pct":-10.526315789473683,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:wicklow-county-council","display_name":"New dwelling completions — wicklow-county-council","region_label":"wicklow-county-council","unit":"count","geography_id":"la:wicklow-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","latest_value":198.0,"data_refreshed_at":"2026-10-11T06:28:26.761898+00:00","prev_period_pct":-30.508474576271187,"year_on_year_pct":-27.472527472527474,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_wicklow-county-council","label":"Single house","latest_value":41.0,"year_on_year_pct":0.0,"unit":"count","display_name":"Single house — Wicklow County Council","region_label":"wicklow-county-council","geography_id":"la:wicklow-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:28:26.761898+00:00","prev_period_pct":-30.508474576271187,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_wicklow-county-council","label":"Scheme house","latest_value":141.0,"year_on_year_pct":-27.692307692307693,"unit":"count","display_name":"Scheme house — Wicklow County Council","region_label":"wicklow-county-council","geography_id":"la:wicklow-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:29:18.102289+00:00","prev_period_pct":-24.598930481283425,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_wicklow-county-council","label":"Apartment","latest_value":16.0,"year_on_year_pct":-56.75675675675676,"unit":"count","display_name":"Apartment — Wicklow County Council","region_label":"wicklow-county-council","geography_id":"la:wicklow-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-04-01","data_refreshed_at":"2026-10-11T06:30:09.641641+00:00","prev_period_pct":-15.789473684210526,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"}]