[{"country":"ie","series_key":"completions_lea_13100400","display_name":"New dwelling completions — Borris-In-Ossory-Mountmellick, Laois","region_label":"13100400","unit":"count","geography_id":"lea:13100400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":15.0,"data_refreshed_at":"2026-11-27T06:32:40.074381+00:00","prev_period_pct":-34.78260869565217,"year_on_year_pct":-65.9090909090909,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13100401","display_name":"New dwelling completions — Portlaoise, Laois","region_label":"13100401","unit":"count","geography_id":"lea:13100401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":52.0,"data_refreshed_at":"2026-11-27T06:32:41.655185+00:00","prev_period_pct":-51.4018691588785,"year_on_year_pct":-68.29268292682927,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13100402","display_name":"New dwelling completions — Graiguecullen -Portarlington, Laois","region_label":"13100402","unit":"count","geography_id":"lea:13100402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":88.0,"data_refreshed_at":"2026-11-27T06:32:43.238282+00:00","prev_period_pct":17.333333333333336,"year_on_year_pct":282.60869565217394,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1310400","display_name":"New dwelling completions — Carlow, Carlow","region_label":"1310400","unit":"count","geography_id":"lea:1310400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":34.0,"data_refreshed_at":"2026-11-27T06:32:44.836470+00:00","prev_period_pct":112.5,"year_on_year_pct":21.428571428571427,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1310401","display_name":"New dwelling completions — Tullow, Carlow","region_label":"1310401","unit":"count","geography_id":"lea:1310401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":15.0,"data_refreshed_at":"2026-11-27T06:32:46.425841+00:00","prev_period_pct":-78.26086956521739,"year_on_year_pct":87.5,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1310402","display_name":"New dwelling completions — Muinebeag, Carlow","region_label":"1310402","unit":"count","geography_id":"lea:1310402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":8.0,"data_refreshed_at":"2026-11-27T06:32:48.009135+00:00","prev_period_pct":-38.46153846153847,"year_on_year_pct":-27.27272727272727,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13110400","display_name":"New dwelling completions — Manorhamilton, Leitrim","region_label":"13110400","unit":"count","geography_id":"lea:13110400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":9.0,"data_refreshed_at":"2026-11-27T06:32:49.594037+00:00","prev_period_pct":-35.714285714285715,"year_on_year_pct":200.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13110401","display_name":"New dwelling completions — Ballinamore, Leitrim","region_label":"13110401","unit":"count","geography_id":"lea:13110401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":6.0,"data_refreshed_at":"2026-11-27T06:32:51.181871+00:00","prev_period_pct":0.0,"year_on_year_pct":20.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13110402","display_name":"New dwelling completions — Carrick-On-Shannon, Leitrim","region_label":"13110402","unit":"count","geography_id":"lea:13110402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":7.0,"data_refreshed_at":"2026-11-27T06:32:52.765854+00:00","prev_period_pct":-41.66666666666667,"year_on_year_pct":-22.22222222222222,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13120400","display_name":"New dwelling completions — Newcastle West, Limerick","region_label":"13120400","unit":"count","geography_id":"lea:13120400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":32.0,"data_refreshed_at":"2026-11-27T06:32:54.369283+00:00","prev_period_pct":-5.88235294117647,"year_on_year_pct":100.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13120401","display_name":"New dwelling completions — Adare-Rathkeale, Limerick","region_label":"13120401","unit":"count","geography_id":"lea:13120401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":21.0,"data_refreshed_at":"2026-11-27T06:32:55.950143+00:00","prev_period_pct":16.666666666666664,"year_on_year_pct":-55.319148936170215,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13120402","display_name":"New dwelling completions — Cappamore-Kilmallock, Limerick","region_label":"13120402","unit":"count","geography_id":"lea:13120402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":42.0,"data_refreshed_at":"2026-11-27T06:32:57.529932+00:00","prev_period_pct":-8.695652173913043,"year_on_year_pct":40.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13120420","display_name":"New dwelling completions — Limerick City West, Limerick","region_label":"13120420","unit":"count","geography_id":"lea:13120420","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":75.0,"data_refreshed_at":"2026-11-27T06:32:59.115745+00:00","prev_period_pct":92.3076923076923,"year_on_year_pct":-5.063291139240507,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13120421","display_name":"New dwelling completions — Limerick City North, Limerick","region_label":"13120421","unit":"count","geography_id":"lea:13120421","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":28.0,"data_refreshed_at":"2026-11-27T06:33:00.702269+00:00","prev_period_pct":21.73913043478261,"year_on_year_pct":27.27272727272727,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13120422","display_name":"New dwelling completions — Limerick City East, Limerick","region_label":"13120422","unit":"count","geography_id":"lea:13120422","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":38.0,"data_refreshed_at":"2026-11-27T06:33:02.290777+00:00","prev_period_pct":52.0,"year_on_year_pct":-2.564102564102564,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13130400","display_name":"New dwelling completions — Granard, Longford","region_label":"13130400","unit":"count","geography_id":"lea:13130400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":13.0,"data_refreshed_at":"2026-11-27T06:33:03.878260+00:00","prev_period_pct":-35.0,"year_on_year_pct":0.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13130401","display_name":"New dwelling completions — Ballymahon, Longford","region_label":"13130401","unit":"count","geography_id":"lea:13130401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":7.0,"data_refreshed_at":"2026-11-27T06:33:05.464613+00:00","prev_period_pct":-22.22222222222222,"year_on_year_pct":40.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13130402","display_name":"New dwelling completions — Longford, Longford","region_label":"13130402","unit":"count","geography_id":"lea:13130402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":47.0,"data_refreshed_at":"2026-11-27T06:33:07.056763+00:00","prev_period_pct":34.285714285714285,"year_on_year_pct":176.47058823529412,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13140400","display_name":"New dwelling completions — Dundalk-Carlingford, Louth","region_label":"13140400","unit":"count","geography_id":"lea:13140400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":62.0,"data_refreshed_at":"2026-11-27T06:33:08.638284+00:00","prev_period_pct":63.1578947368421,"year_on_year_pct":158.33333333333331,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13140401","display_name":"New dwelling completions — Dundalk South, Louth","region_label":"13140401","unit":"count","geography_id":"lea:13140401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":60.0,"data_refreshed_at":"2026-11-27T06:33:10.222873+00:00","prev_period_pct":-36.17021276595745,"year_on_year_pct":-42.857142857142854,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13140402","display_name":"New dwelling completions — Ardee, Louth","region_label":"13140402","unit":"count","geography_id":"lea:13140402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":88.0,"data_refreshed_at":"2026-11-27T06:33:11.803770+00:00","prev_period_pct":11.39240506329114,"year_on_year_pct":137.83783783783784,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13140403","display_name":"New dwelling completions — Drogheda Rural, Louth","region_label":"13140403","unit":"count","geography_id":"lea:13140403","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":157.0,"data_refreshed_at":"2026-11-27T06:33:13.388587+00:00","prev_period_pct":-38.43137254901961,"year_on_year_pct":25.6,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13140404","display_name":"New dwelling completions — Drogheda Urban, Louth","region_label":"13140404","unit":"count","geography_id":"lea:13140404","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":3.0,"data_refreshed_at":"2026-11-27T06:33:14.966888+00:00","prev_period_pct":-70.0,"year_on_year_pct":-91.17647058823529,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13150400","display_name":"New dwelling completions — Ballina, Mayo","region_label":"13150400","unit":"count","geography_id":"lea:13150400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":21.0,"data_refreshed_at":"2026-11-27T06:33:16.548992+00:00","prev_period_pct":75.0,"year_on_year_pct":133.33333333333331,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13150401","display_name":"New dwelling completions — Claremorris, Mayo","region_label":"13150401","unit":"count","geography_id":"lea:13150401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":17.0,"data_refreshed_at":"2026-11-27T06:33:18.128312+00:00","prev_period_pct":-10.526315789473683,"year_on_year_pct":-5.555555555555555,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13150402","display_name":"New dwelling completions — Castlebar, Mayo","region_label":"13150402","unit":"count","geography_id":"lea:13150402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":66.0,"data_refreshed_at":"2026-11-27T06:33:19.716870+00:00","prev_period_pct":40.42553191489361,"year_on_year_pct":135.71428571428572,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13150403","display_name":"New dwelling completions — Belmullet, Mayo","region_label":"13150403","unit":"count","geography_id":"lea:13150403","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":13.0,"data_refreshed_at":"2026-11-27T06:33:21.298416+00:00","prev_period_pct":160.0,"year_on_year_pct":-45.83333333333333,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13150404","display_name":"New dwelling completions — Westport, Mayo","region_label":"13150404","unit":"count","geography_id":"lea:13150404","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":17.0,"data_refreshed_at":"2026-11-27T06:33:22.883778+00:00","prev_period_pct":-10.526315789473683,"year_on_year_pct":-39.285714285714285,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13150405","display_name":"New dwelling completions — Swinford, Mayo","region_label":"13150405","unit":"count","geography_id":"lea:13150405","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":13.0,"data_refreshed_at":"2026-11-27T06:33:24.470568+00:00","prev_period_pct":-7.142857142857142,"year_on_year_pct":-18.75,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13160400","display_name":"New dwelling completions — Kells, Meath","region_label":"13160400","unit":"count","geography_id":"lea:13160400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":45.0,"data_refreshed_at":"2026-11-27T06:33:26.054991+00:00","prev_period_pct":-29.6875,"year_on_year_pct":-54.08163265306123,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13160401","display_name":"New dwelling completions — Laytown-Bettystown, Meath","region_label":"13160401","unit":"count","geography_id":"lea:13160401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":25.0,"data_refreshed_at":"2026-11-27T06:33:27.635648+00:00","prev_period_pct":-52.83018867924528,"year_on_year_pct":-62.121212121212125,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13160402","display_name":"New dwelling completions — Ashbourne, Meath","region_label":"13160402","unit":"count","geography_id":"lea:13160402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":73.0,"data_refreshed_at":"2026-11-27T06:33:29.220766+00:00","prev_period_pct":102.77777777777777,"year_on_year_pct":-15.11627906976744,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13160403","display_name":"New dwelling completions — Ratoath, Meath","region_label":"13160403","unit":"count","geography_id":"lea:13160403","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":195.0,"data_refreshed_at":"2026-11-27T06:33:30.804168+00:00","prev_period_pct":150.0,"year_on_year_pct":37.32394366197183,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13160404","display_name":"New dwelling completions — Trim, Meath","region_label":"13160404","unit":"count","geography_id":"lea:13160404","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":145.0,"data_refreshed_at":"2026-11-27T06:33:32.385457+00:00","prev_period_pct":17.88617886178862,"year_on_year_pct":83.54430379746836,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13160405","display_name":"New dwelling completions — Navan, Meath","region_label":"13160405","unit":"count","geography_id":"lea:13160405","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":100.0,"data_refreshed_at":"2026-11-27T06:33:33.968492+00:00","prev_period_pct":-6.5420560747663545,"year_on_year_pct":-31.97278911564626,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13170400","display_name":"New dwelling completions — Monaghan, Monaghan","region_label":"13170400","unit":"count","geography_id":"lea:13170400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":29.0,"data_refreshed_at":"2026-11-27T06:33:35.555075+00:00","prev_period_pct":-50.0,"year_on_year_pct":-9.375,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13170401","display_name":"New dwelling completions — Carrickmacross-Castleblayney, Monaghan","region_label":"13170401","unit":"count","geography_id":"lea:13170401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":21.0,"data_refreshed_at":"2026-11-27T06:33:37.148582+00:00","prev_period_pct":16.666666666666664,"year_on_year_pct":-41.66666666666667,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13170402","display_name":"New dwelling completions — Ballybay-Clones, Monaghan","region_label":"13170402","unit":"count","geography_id":"lea:13170402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":17.0,"data_refreshed_at":"2026-11-27T06:33:38.733750+00:00","prev_period_pct":6.25,"year_on_year_pct":-15.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13180400","display_name":"New dwelling completions — Birr, Offaly","region_label":"13180400","unit":"count","geography_id":"lea:13180400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":42.0,"data_refreshed_at":"2026-11-27T06:33:40.319401+00:00","prev_period_pct":55.55555555555556,"year_on_year_pct":121.05263157894737,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13180401","display_name":"New dwelling completions — Tullamore, Offaly","region_label":"13180401","unit":"count","geography_id":"lea:13180401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":63.0,"data_refreshed_at":"2026-11-27T06:33:41.907002+00:00","prev_period_pct":-14.864864864864865,"year_on_year_pct":1160.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13180402","display_name":"New dwelling completions — Edenderry, Offaly","region_label":"13180402","unit":"count","geography_id":"lea:13180402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":21.0,"data_refreshed_at":"2026-11-27T06:33:43.496234+00:00","prev_period_pct":-54.347826086956516,"year_on_year_pct":-58.82352941176471,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13190400","display_name":"New dwelling completions — Boyle, Roscommon","region_label":"13190400","unit":"count","geography_id":"lea:13190400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":14.0,"data_refreshed_at":"2026-11-27T06:33:45.086281+00:00","prev_period_pct":40.0,"year_on_year_pct":-41.66666666666667,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13190401","display_name":"New dwelling completions — Roscommon, Roscommon","region_label":"13190401","unit":"count","geography_id":"lea:13190401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":25.0,"data_refreshed_at":"2026-11-27T06:33:46.667668+00:00","prev_period_pct":-30.555555555555557,"year_on_year_pct":56.25,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13190402","display_name":"New dwelling completions — Athlone, Roscommon","region_label":"13190402","unit":"count","geography_id":"lea:13190402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":43.0,"data_refreshed_at":"2026-11-27T06:33:48.248763+00:00","prev_period_pct":53.57142857142857,"year_on_year_pct":79.16666666666666,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13200400","display_name":"New dwelling completions — Ballymote-Tobercurry, Sligo","region_label":"13200400","unit":"count","geography_id":"lea:13200400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":22.0,"data_refreshed_at":"2026-11-27T06:33:49.827998+00:00","prev_period_pct":-35.294117647058826,"year_on_year_pct":29.411764705882355,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13200401","display_name":"New dwelling completions — Sligo-Drumcliff, Sligo","region_label":"13200401","unit":"count","geography_id":"lea:13200401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":25.0,"data_refreshed_at":"2026-11-27T06:33:51.407630+00:00","prev_period_pct":-48.97959183673469,"year_on_year_pct":-16.666666666666664,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13200402","display_name":"New dwelling completions — Sligo-Strandhill, Sligo","region_label":"13200402","unit":"count","geography_id":"lea:13200402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":30.0,"data_refreshed_at":"2026-11-27T06:33:52.993751+00:00","prev_period_pct":3.4482758620689653,"year_on_year_pct":-57.14285714285714,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1320400","display_name":"New dwelling completions — Cavan-Belturbet, Cavan","region_label":"1320400","unit":"count","geography_id":"lea:1320400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":70.0,"data_refreshed_at":"2026-11-27T06:33:54.579729+00:00","prev_period_pct":169.23076923076923,"year_on_year_pct":14.754098360655737,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1320401","display_name":"New dwelling completions — Bailieborough-Cootehill, Cavan","region_label":"1320401","unit":"count","geography_id":"lea:1320401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":17.0,"data_refreshed_at":"2026-11-27T06:33:56.164587+00:00","prev_period_pct":-70.17543859649122,"year_on_year_pct":-48.484848484848484,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1320402","display_name":"New dwelling completions — Ballyjamesduff, Cavan","region_label":"1320402","unit":"count","geography_id":"lea:1320402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":8.0,"data_refreshed_at":"2026-11-27T06:33:57.756707+00:00","prev_period_pct":-68.0,"year_on_year_pct":-61.904761904761905,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13210400","display_name":"New dwelling completions — Nenagh, Tipperary","region_label":"13210400","unit":"count","geography_id":"lea:13210400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":38.0,"data_refreshed_at":"2026-11-27T06:33:59.339083+00:00","prev_period_pct":22.58064516129032,"year_on_year_pct":58.333333333333336,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13210401","display_name":"New dwelling completions — Roscrea-Templemore, Tipperary","region_label":"13210401","unit":"count","geography_id":"lea:13210401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":25.0,"data_refreshed_at":"2026-11-27T06:34:00.919661+00:00","prev_period_pct":38.88888888888889,"year_on_year_pct":56.25,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13210402","display_name":"New dwelling completions — Carrick-On-Suir, Tipperary","region_label":"13210402","unit":"count","geography_id":"lea:13210402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":5.0,"data_refreshed_at":"2026-11-27T06:34:02.502492+00:00","prev_period_pct":-37.5,"year_on_year_pct":-77.27272727272727,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13210403","display_name":"New dwelling completions — Clonmel, Tipperary","region_label":"13210403","unit":"count","geography_id":"lea:13210403","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":27.0,"data_refreshed_at":"2026-11-27T06:34:04.087821+00:00","prev_period_pct":107.6923076923077,"year_on_year_pct":-35.714285714285715,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13210404","display_name":"New dwelling completions — Cashel-Tipperary, Tipperary","region_label":"13210404","unit":"count","geography_id":"lea:13210404","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":25.0,"data_refreshed_at":"2026-11-27T06:34:05.674283+00:00","prev_period_pct":-50.98039215686274,"year_on_year_pct":13.636363636363635,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13210405","display_name":"New dwelling completions — Newport, Tipperary","region_label":"13210405","unit":"count","geography_id":"lea:13210405","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":14.0,"data_refreshed_at":"2026-11-27T06:34:07.252471+00:00","prev_period_pct":-17.647058823529413,"year_on_year_pct":55.55555555555556,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13210406","display_name":"New dwelling completions — Thurles, Tipperary","region_label":"13210406","unit":"count","geography_id":"lea:13210406","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":7.0,"data_refreshed_at":"2026-11-27T06:34:08.836044+00:00","prev_period_pct":-70.83333333333334,"year_on_year_pct":-89.55223880597015,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13210407","display_name":"New dwelling completions — Cahir, Tipperary","region_label":"13210407","unit":"count","geography_id":"lea:13210407","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":10.0,"data_refreshed_at":"2026-11-27T06:34:10.420183+00:00","prev_period_pct":42.857142857142854,"year_on_year_pct":-37.5,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13220400","display_name":"New dwelling completions — Dungarvan, Waterford","region_label":"13220400","unit":"count","geography_id":"lea:13220400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":51.0,"data_refreshed_at":"2026-11-27T06:34:12.017396+00:00","prev_period_pct":218.75,"year_on_year_pct":240.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13220401","display_name":"New dwelling completions — Portlaw-Kilmacthomas, Waterford","region_label":"13220401","unit":"count","geography_id":"lea:13220401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":19.0,"data_refreshed_at":"2026-11-27T06:34:13.606013+00:00","prev_period_pct":-5.0,"year_on_year_pct":-58.69565217391305,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13220402","display_name":"New dwelling completions — Lismore, Waterford","region_label":"13220402","unit":"count","geography_id":"lea:13220402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":6.0,"data_refreshed_at":"2026-11-27T06:34:15.187924+00:00","prev_period_pct":-14.285714285714285,"year_on_year_pct":200.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13220420","display_name":"New dwelling completions — Tramore-Waterford City West, Waterford","region_label":"13220420","unit":"count","geography_id":"lea:13220420","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":71.0,"data_refreshed_at":"2026-11-27T06:34:16.770128+00:00","prev_period_pct":407.1428571428571,"year_on_year_pct":129.03225806451613,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13220421","display_name":"New dwelling completions — Waterford City South, Waterford","region_label":"13220421","unit":"count","geography_id":"lea:13220421","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":29.0,"data_refreshed_at":"2026-11-27T06:34:18.352108+00:00","prev_period_pct":-30.952380952380953,"year_on_year_pct":38.095238095238095,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13220422","display_name":"New dwelling completions — Waterford City East, Waterford","region_label":"13220422","unit":"count","geography_id":"lea:13220422","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":65.0,"data_refreshed_at":"2026-11-27T06:34:19.933680+00:00","prev_period_pct":25.0,"year_on_year_pct":-32.29166666666667,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13230400","display_name":"New dwelling completions — Athlone, Westmeath","region_label":"13230400","unit":"count","geography_id":"lea:13230400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":102.0,"data_refreshed_at":"2026-11-27T06:34:21.513094+00:00","prev_period_pct":100.0,"year_on_year_pct":67.21311475409836,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13230401","display_name":"New dwelling completions — Moate, Westmeath","region_label":"13230401","unit":"count","geography_id":"lea:13230401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":38.0,"data_refreshed_at":"2026-11-27T06:34:23.101180+00:00","prev_period_pct":58.333333333333336,"year_on_year_pct":80.95238095238095,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13230402","display_name":"New dwelling completions — Kinnegad, Westmeath","region_label":"13230402","unit":"count","geography_id":"lea:13230402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":19.0,"data_refreshed_at":"2026-11-27T06:34:24.692033+00:00","prev_period_pct":5.555555555555555,"year_on_year_pct":-50.0,"caveats":[{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13230403","display_name":"New dwelling completions — Mullingar, Westmeath","region_label":"13230403","unit":"count","geography_id":"lea:13230403","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":66.0,"data_refreshed_at":"2026-11-27T06:34:26.288508+00:00","prev_period_pct":-12.0,"year_on_year_pct":-35.92233009708738,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13240400","display_name":"New dwelling completions — Gorey, Wexford","region_label":"13240400","unit":"count","geography_id":"lea:13240400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":82.0,"data_refreshed_at":"2026-11-27T06:34:27.874994+00:00","prev_period_pct":-1.2048192771084338,"year_on_year_pct":30.158730158730158,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13240401","display_name":"New dwelling completions — Kilmuckridge, Wexford","region_label":"13240401","unit":"count","geography_id":"lea:13240401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":21.0,"data_refreshed_at":"2026-11-27T06:34:29.462537+00:00","prev_period_pct":110.00000000000001,"year_on_year_pct":23.52941176470588,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13240402","display_name":"New dwelling completions — New Ross, Wexford","region_label":"13240402","unit":"count","geography_id":"lea:13240402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":13.0,"data_refreshed_at":"2026-11-27T06:34:31.046992+00:00","prev_period_pct":-45.83333333333333,"year_on_year_pct":-51.85185185185185,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13240403","display_name":"New dwelling completions — Rosslare, Wexford","region_label":"13240403","unit":"count","geography_id":"lea:13240403","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":14.0,"data_refreshed_at":"2026-11-27T06:34:32.631466+00:00","prev_period_pct":-44.0,"year_on_year_pct":-70.83333333333334,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13240404","display_name":"New dwelling completions — Wexford, Wexford","region_label":"13240404","unit":"count","geography_id":"lea:13240404","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":136.0,"data_refreshed_at":"2026-11-27T06:34:34.218092+00:00","prev_period_pct":52.80898876404494,"year_on_year_pct":70.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13240405","display_name":"New dwelling completions — Enniscorthy, Wexford","region_label":"13240405","unit":"count","geography_id":"lea:13240405","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":48.0,"data_refreshed_at":"2026-11-27T06:34:35.810020+00:00","prev_period_pct":23.076923076923077,"year_on_year_pct":11.627906976744185,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13250400","display_name":"New dwelling completions — Baltinglass, Wicklow","region_label":"13250400","unit":"count","geography_id":"lea:13250400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":61.0,"data_refreshed_at":"2026-11-27T06:34:37.396333+00:00","prev_period_pct":96.7741935483871,"year_on_year_pct":7.017543859649122,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13250401","display_name":"New dwelling completions — Bray West, Wicklow","region_label":"13250401","unit":"count","geography_id":"lea:13250401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":22.0,"data_refreshed_at":"2026-11-27T06:34:38.980054+00:00","prev_period_pct":-24.137931034482758,"year_on_year_pct":57.14285714285714,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13250402","display_name":"New dwelling completions — Greystones, Wicklow","region_label":"13250402","unit":"count","geography_id":"lea:13250402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":57.0,"data_refreshed_at":"2026-11-27T06:34:40.564919+00:00","prev_period_pct":35.714285714285715,"year_on_year_pct":-18.571428571428573,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13250403","display_name":"New dwelling completions — Wicklow, Wicklow","region_label":"13250403","unit":"count","geography_id":"lea:13250403","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":111.0,"data_refreshed_at":"2026-11-27T06:34:42.149085+00:00","prev_period_pct":63.23529411764706,"year_on_year_pct":0.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13250404","display_name":"New dwelling completions — Arklow, Wicklow","region_label":"13250404","unit":"count","geography_id":"lea:13250404","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":8.0,"data_refreshed_at":"2026-11-27T06:34:43.734956+00:00","prev_period_pct":-52.94117647058824,"year_on_year_pct":-78.94736842105263,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13250405","display_name":"New dwelling completions — Bray East, Wicklow","region_label":"13250405","unit":"count","geography_id":"lea:13250405","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":7.0,"data_refreshed_at":"2026-11-27T06:34:45.324420+00:00","prev_period_pct":-36.36363636363637,"year_on_year_pct":-84.78260869565217,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260400","display_name":"New dwelling completions — Rush-Lusk, Fingal","region_label":"13260400","unit":"count","geography_id":"lea:13260400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":347.0,"data_refreshed_at":"2026-11-27T06:34:46.917543+00:00","prev_period_pct":39.3574297188755,"year_on_year_pct":52.863436123348016,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260401","display_name":"New dwelling completions — Swords, Fingal","region_label":"13260401","unit":"count","geography_id":"lea:13260401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":237.0,"data_refreshed_at":"2026-11-27T06:34:48.505952+00:00","prev_period_pct":-36.29032258064516,"year_on_year_pct":22.797927461139896,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260402","display_name":"New dwelling completions — Blanchardstown-Mulhuddart, Fingal","region_label":"13260402","unit":"count","geography_id":"lea:13260402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":85.0,"data_refreshed_at":"2026-11-27T06:34:50.087802+00:00","prev_period_pct":-56.63265306122449,"year_on_year_pct":-63.04347826086957,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260403","display_name":"New dwelling completions — Castleknock, Fingal","region_label":"13260403","unit":"count","geography_id":"lea:13260403","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":19.0,"data_refreshed_at":"2026-11-27T06:34:51.671215+00:00","prev_period_pct":-45.714285714285715,"year_on_year_pct":-20.833333333333336,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260404","display_name":"New dwelling completions — Howth-Malahide, Fingal","region_label":"13260404","unit":"count","geography_id":"lea:13260404","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":121.0,"data_refreshed_at":"2026-11-27T06:34:53.255726+00:00","prev_period_pct":0.8333333333333334,"year_on_year_pct":120.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260405","display_name":"New dwelling completions — Stillorgan, Dún Laoghaire-Rathdown","region_label":"13260405","unit":"count","geography_id":"lea:13260405","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":100.0,"data_refreshed_at":"2026-11-27T06:34:54.835036+00:00","prev_period_pct":257.14285714285717,"year_on_year_pct":900.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260406","display_name":"New dwelling completions — Dundrum, Dún Laoghaire-Rathdown","region_label":"13260406","unit":"count","geography_id":"lea:13260406","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":4.0,"data_refreshed_at":"2026-11-27T06:34:56.416398+00:00","prev_period_pct":-66.66666666666666,"year_on_year_pct":-93.84615384615384,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260407","display_name":"New dwelling completions — Glencullen-Sandyford, Dún Laoghaire-Rathdown","region_label":"13260407","unit":"count","geography_id":"lea:13260407","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":199.0,"data_refreshed_at":"2026-11-27T06:34:58.004282+00:00","prev_period_pct":9850.0,"year_on_year_pct":25.157232704402517,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260408","display_name":"New dwelling completions — Killiney-Shankill, Dún Laoghaire-Rathdown","region_label":"13260408","unit":"count","geography_id":"lea:13260408","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":430.0,"data_refreshed_at":"2026-11-27T06:34:59.586545+00:00","prev_period_pct":74.08906882591093,"year_on_year_pct":182.89473684210526,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260409","display_name":"New dwelling completions — Dún Laoghaire, Dún Laoghaire-Rathdown","region_label":"13260409","unit":"count","geography_id":"lea:13260409","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":8.0,"data_refreshed_at":"2026-11-27T06:35:01.170036+00:00","prev_period_pct":166.66666666666669,"year_on_year_pct":-88.57142857142857,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260410","display_name":"New dwelling completions — Blackrock, Dún Laoghaire-Rathdown","region_label":"13260410","unit":"count","geography_id":"lea:13260410","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":0.0,"data_refreshed_at":"2026-11-27T06:35:02.756165+00:00","prev_period_pct":-100.0,"year_on_year_pct":-100.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260411","display_name":"New dwelling completions — Lucan, South Dublin","region_label":"13260411","unit":"count","geography_id":"lea:13260411","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":259.0,"data_refreshed_at":"2026-11-27T06:35:04.340722+00:00","prev_period_pct":-8.80281690140845,"year_on_year_pct":-15.909090909090908,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260412","display_name":"New dwelling completions — Tallaght Central, South Dublin","region_label":"13260412","unit":"count","geography_id":"lea:13260412","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":1.0,"data_refreshed_at":"2026-11-27T06:35:05.924648+00:00","prev_period_pct":0.0,"year_on_year_pct":-66.66666666666666,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260413","display_name":"New dwelling completions — Rathfarnham-Templeogue, South Dublin","region_label":"13260413","unit":"count","geography_id":"lea:13260413","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":12.0,"data_refreshed_at":"2026-11-27T06:35:07.517905+00:00","prev_period_pct":200.0,"year_on_year_pct":50.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260414","display_name":"New dwelling completions — Firhouse-Bohernabreena, South Dublin","region_label":"13260414","unit":"count","geography_id":"lea:13260414","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":19.0,"data_refreshed_at":"2026-11-27T06:35:09.111383+00:00","prev_period_pct":-73.61111111111111,"year_on_year_pct":-13.636363636363635,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260415","display_name":"New dwelling completions — Tallaght South, South Dublin","region_label":"13260415","unit":"count","geography_id":"lea:13260415","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":2.0,"data_refreshed_at":"2026-11-27T06:35:10.696640+00:00","prev_period_pct":-85.71428571428571,"year_on_year_pct":-98.93048128342245,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260416","display_name":"New dwelling completions — Clondalkin, South Dublin","region_label":"13260416","unit":"count","geography_id":"lea:13260416","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":476.0,"data_refreshed_at":"2026-11-27T06:35:12.280223+00:00","prev_period_pct":140.4040404040404,"year_on_year_pct":-25.624999999999996,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260417","display_name":"New dwelling completions — Balbriggan, Fingal","region_label":"13260417","unit":"count","geography_id":"lea:13260417","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":161.0,"data_refreshed_at":"2026-11-27T06:35:13.862245+00:00","prev_period_pct":631.8181818181819,"year_on_year_pct":3120.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260418","display_name":"New dwelling completions — Ongar, Fingal","region_label":"13260418","unit":"count","geography_id":"lea:13260418","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":1.0,"data_refreshed_at":"2026-11-27T06:35:15.442725+00:00","prev_period_pct":-96.15384615384616,"year_on_year_pct":-95.83333333333334,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260419","display_name":"New dwelling completions — Palmerstown-Fonthill, South Dublin","region_label":"13260419","unit":"count","geography_id":"lea:13260419","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":24.0,"data_refreshed_at":"2026-11-27T06:35:17.026137+00:00","prev_period_pct":null,"year_on_year_pct":null,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260420","display_name":"New dwelling completions — Ballymun-Finglas, Dublin City","region_label":"13260420","unit":"count","geography_id":"lea:13260420","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":3.0,"data_refreshed_at":"2026-11-27T06:35:18.609898+00:00","prev_period_pct":-91.42857142857143,"year_on_year_pct":50.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260421","display_name":"New dwelling completions — Cabra-Glasnevin, Dublin City","region_label":"13260421","unit":"count","geography_id":"lea:13260421","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":46.0,"data_refreshed_at":"2026-11-27T06:35:20.190505+00:00","prev_period_pct":-90.10752688172043,"year_on_year_pct":475.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260422","display_name":"New dwelling completions — Ballyfermot-Drimnagh, Dublin City","region_label":"13260422","unit":"count","geography_id":"lea:13260422","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":1.0,"data_refreshed_at":"2026-11-27T06:35:21.785380+00:00","prev_period_pct":-98.52941176470588,"year_on_year_pct":-99.17355371900827,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260423","display_name":"New dwelling completions — Kimmage-Rathmines, Dublin City","region_label":"13260423","unit":"count","geography_id":"lea:13260423","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":59.0,"data_refreshed_at":"2026-11-27T06:35:23.366532+00:00","prev_period_pct":1080.0,"year_on_year_pct":-53.90625,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260424","display_name":"New dwelling completions — Pembroke, Dublin City","region_label":"13260424","unit":"count","geography_id":"lea:13260424","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":18.0,"data_refreshed_at":"2026-11-27T06:35:24.943329+00:00","prev_period_pct":80.0,"year_on_year_pct":500.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260425","display_name":"New dwelling completions — South East Inner City, Dublin City","region_label":"13260425","unit":"count","geography_id":"lea:13260425","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":32.0,"data_refreshed_at":"2026-11-27T06:35:26.523695+00:00","prev_period_pct":-31.914893617021278,"year_on_year_pct":-86.77685950413223,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260426","display_name":"New dwelling completions — North Inner City, Dublin City","region_label":"13260426","unit":"count","geography_id":"lea:13260426","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":76.0,"data_refreshed_at":"2026-11-27T06:35:28.103401+00:00","prev_period_pct":-60.824742268041234,"year_on_year_pct":-66.22222222222223,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260427","display_name":"New dwelling completions — Clontarf, Dublin City","region_label":"13260427","unit":"count","geography_id":"lea:13260427","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":3.0,"data_refreshed_at":"2026-11-27T06:35:29.683181+00:00","prev_period_pct":-75.0,"year_on_year_pct":-96.42857142857143,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260428","display_name":"New dwelling completions — Donaghmede, Dublin City","region_label":"13260428","unit":"count","geography_id":"lea:13260428","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":310.0,"data_refreshed_at":"2026-11-27T06:35:31.268750+00:00","prev_period_pct":89.02439024390245,"year_on_year_pct":369.6969696969697,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260429","display_name":"New dwelling completions — Artane-Whitehall, Dublin City","region_label":"13260429","unit":"count","geography_id":"lea:13260429","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":420.0,"data_refreshed_at":"2026-11-27T06:35:32.850539+00:00","prev_period_pct":58.490566037735846,"year_on_year_pct":10400.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_13260430","display_name":"New dwelling completions — South West Inner City, Dublin City","region_label":"13260430","unit":"count","geography_id":"lea:13260430","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":246.0,"data_refreshed_at":"2026-11-27T06:35:34.450884+00:00","prev_period_pct":1540.0,"year_on_year_pct":1018.1818181818181,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1330400","display_name":"New dwelling completions — Ennistimon, Clare","region_label":"1330400","unit":"count","geography_id":"lea:1330400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":37.0,"data_refreshed_at":"2026-11-27T06:35:36.032466+00:00","prev_period_pct":-7.5,"year_on_year_pct":32.142857142857146,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1330401","display_name":"New dwelling completions — Killaloe, Clare","region_label":"1330401","unit":"count","geography_id":"lea:1330401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":28.0,"data_refreshed_at":"2026-11-27T06:35:37.614981+00:00","prev_period_pct":27.27272727272727,"year_on_year_pct":-17.647058823529413,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1330402","display_name":"New dwelling completions — Shannon, Clare","region_label":"1330402","unit":"count","geography_id":"lea:1330402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":42.0,"data_refreshed_at":"2026-11-27T06:35:39.196921+00:00","prev_period_pct":-22.22222222222222,"year_on_year_pct":-10.638297872340425,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1330403","display_name":"New dwelling completions — Ennis, Clare","region_label":"1330403","unit":"count","geography_id":"lea:1330403","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":32.0,"data_refreshed_at":"2026-11-27T06:35:40.778416+00:00","prev_period_pct":-5.88235294117647,"year_on_year_pct":190.9090909090909,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1330404","display_name":"New dwelling completions — Kilrush, Clare","region_label":"1330404","unit":"count","geography_id":"lea:1330404","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":23.0,"data_refreshed_at":"2026-11-27T06:35:42.362504+00:00","prev_period_pct":-17.857142857142858,"year_on_year_pct":-8.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1340400","display_name":"New dwelling completions — Kanturk, Cork County","region_label":"1340400","unit":"count","geography_id":"lea:1340400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":52.0,"data_refreshed_at":"2026-11-27T06:35:43.945489+00:00","prev_period_pct":147.61904761904762,"year_on_year_pct":100.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1340401","display_name":"New dwelling completions — Fermoy, Cork County","region_label":"1340401","unit":"count","geography_id":"lea:1340401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":43.0,"data_refreshed_at":"2026-11-27T06:35:45.527067+00:00","prev_period_pct":126.3157894736842,"year_on_year_pct":4.878048780487805,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1340402","display_name":"New dwelling completions — Midleton, Cork County","region_label":"1340402","unit":"count","geography_id":"lea:1340402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":123.0,"data_refreshed_at":"2026-11-27T06:35:47.131984+00:00","prev_period_pct":50.0,"year_on_year_pct":9.821428571428571,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1340403","display_name":"New dwelling completions — Carrigaline, Cork County","region_label":"1340403","unit":"count","geography_id":"lea:1340403","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":46.0,"data_refreshed_at":"2026-11-27T06:35:48.718927+00:00","prev_period_pct":6.976744186046512,"year_on_year_pct":-43.90243902439025,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1340404","display_name":"New dwelling completions — Cobh, Cork County","region_label":"1340404","unit":"count","geography_id":"lea:1340404","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":143.0,"data_refreshed_at":"2026-11-27T06:35:50.299833+00:00","prev_period_pct":-1.3793103448275863,"year_on_year_pct":160.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1340405","display_name":"New dwelling completions — Bandon-Kinsale, Cork County","region_label":"1340405","unit":"count","geography_id":"lea:1340405","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":122.0,"data_refreshed_at":"2026-11-27T06:35:51.881863+00:00","prev_period_pct":50.617283950617285,"year_on_year_pct":106.77966101694916,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1340406","display_name":"New dwelling completions — Bantry-West Cork, Cork County","region_label":"1340406","unit":"count","geography_id":"lea:1340406","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":18.0,"data_refreshed_at":"2026-11-27T06:35:53.461772+00:00","prev_period_pct":5.88235294117647,"year_on_year_pct":-25.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1340407","display_name":"New dwelling completions — Skibbereen-West Cork, Cork County","region_label":"1340407","unit":"count","geography_id":"lea:1340407","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":25.0,"data_refreshed_at":"2026-11-27T06:35:55.047076+00:00","prev_period_pct":0.0,"year_on_year_pct":-34.21052631578947,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1340408","display_name":"New dwelling completions — Macroom, Cork County","region_label":"1340408","unit":"count","geography_id":"lea:1340408","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":52.0,"data_refreshed_at":"2026-11-27T06:35:56.629571+00:00","prev_period_pct":30.0,"year_on_year_pct":-30.666666666666664,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1340409","display_name":"New dwelling completions — Mallow, Cork County","region_label":"1340409","unit":"count","geography_id":"lea:1340409","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":74.0,"data_refreshed_at":"2026-11-27T06:35:58.219980+00:00","prev_period_pct":105.55555555555556,"year_on_year_pct":164.28571428571428,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1340410","display_name":"New dwelling completions — Cork City North West, Cork City","region_label":"1340410","unit":"count","geography_id":"lea:1340410","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":47.0,"data_refreshed_at":"2026-11-27T06:35:59.812255+00:00","prev_period_pct":-28.78787878787879,"year_on_year_pct":-37.333333333333336,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1340411","display_name":"New dwelling completions — Cork City North East, Cork City","region_label":"1340411","unit":"count","geography_id":"lea:1340411","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":206.0,"data_refreshed_at":"2026-11-27T06:36:01.398744+00:00","prev_period_pct":12.568306010928962,"year_on_year_pct":54.88721804511278,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1340412","display_name":"New dwelling completions — Cork City South East, Cork City","region_label":"1340412","unit":"count","geography_id":"lea:1340412","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":288.0,"data_refreshed_at":"2026-11-27T06:36:02.981502+00:00","prev_period_pct":231.0344827586207,"year_on_year_pct":73.49397590361446,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1340413","display_name":"New dwelling completions — Cork City South Central, Cork City","region_label":"1340413","unit":"count","geography_id":"lea:1340413","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":14.0,"data_refreshed_at":"2026-11-27T06:36:04.568709+00:00","prev_period_pct":-26.31578947368421,"year_on_year_pct":-39.130434782608695,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1340414","display_name":"New dwelling completions — Cork City South West, Cork City","region_label":"1340414","unit":"count","geography_id":"lea:1340414","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":88.0,"data_refreshed_at":"2026-11-27T06:36:06.151640+00:00","prev_period_pct":151.42857142857142,"year_on_year_pct":-10.204081632653061,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1350400","display_name":"New dwelling completions — Glenties, Donegal","region_label":"1350400","unit":"count","geography_id":"lea:1350400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":39.0,"data_refreshed_at":"2026-11-27T06:36:07.737302+00:00","prev_period_pct":14.705882352941178,"year_on_year_pct":11.428571428571429,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1350401","display_name":"New dwelling completions — Milford, Donegal","region_label":"1350401","unit":"count","geography_id":"lea:1350401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":15.0,"data_refreshed_at":"2026-11-27T06:36:09.320696+00:00","prev_period_pct":0.0,"year_on_year_pct":-21.052631578947366,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1350402","display_name":"New dwelling completions — Carndonagh, Donegal","region_label":"1350402","unit":"count","geography_id":"lea:1350402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":19.0,"data_refreshed_at":"2026-11-27T06:36:10.899768+00:00","prev_period_pct":-44.11764705882353,"year_on_year_pct":58.333333333333336,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1350403","display_name":"New dwelling completions — Buncrana, Donegal","region_label":"1350403","unit":"count","geography_id":"lea:1350403","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":18.0,"data_refreshed_at":"2026-11-27T06:36:12.483992+00:00","prev_period_pct":12.5,"year_on_year_pct":12.5,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1350404","display_name":"New dwelling completions — Donegal, Donegal","region_label":"1350404","unit":"count","geography_id":"lea:1350404","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":38.0,"data_refreshed_at":"2026-11-27T06:36:14.073072+00:00","prev_period_pct":80.95238095238095,"year_on_year_pct":153.33333333333334,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1350405","display_name":"New dwelling completions — Letterkenny, Donegal","region_label":"1350405","unit":"count","geography_id":"lea:1350405","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":40.0,"data_refreshed_at":"2026-11-27T06:36:15.658581+00:00","prev_period_pct":-24.528301886792452,"year_on_year_pct":5.263157894736842,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1350406","display_name":"New dwelling completions — Lifford-Stranorlar, Donegal","region_label":"1350406","unit":"count","geography_id":"lea:1350406","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":51.0,"data_refreshed_at":"2026-11-27T06:36:17.240398+00:00","prev_period_pct":64.51612903225806,"year_on_year_pct":34.21052631578947,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1360400","display_name":"New dwelling completions — Conamara North, Galway County","region_label":"1360400","unit":"count","geography_id":"lea:1360400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":30.0,"data_refreshed_at":"2026-11-27T06:36:18.821205+00:00","prev_period_pct":30.434782608695656,"year_on_year_pct":76.47058823529412,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1360401","display_name":"New dwelling completions — Tuam, Galway County","region_label":"1360401","unit":"count","geography_id":"lea:1360401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":32.0,"data_refreshed_at":"2026-11-27T06:36:20.398845+00:00","prev_period_pct":10.344827586206897,"year_on_year_pct":-17.94871794871795,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1360402","display_name":"New dwelling completions — Ballinasloe, Galway County","region_label":"1360402","unit":"count","geography_id":"lea:1360402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":36.0,"data_refreshed_at":"2026-11-27T06:36:21.980019+00:00","prev_period_pct":89.47368421052632,"year_on_year_pct":5.88235294117647,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1360403","display_name":"New dwelling completions — Loughrea, Galway County","region_label":"1360403","unit":"count","geography_id":"lea:1360403","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":34.0,"data_refreshed_at":"2026-11-27T06:36:23.594032+00:00","prev_period_pct":-26.08695652173913,"year_on_year_pct":17.24137931034483,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1360404","display_name":"New dwelling completions — Athenry-Oranmore, Galway County","region_label":"1360404","unit":"count","geography_id":"lea:1360404","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":124.0,"data_refreshed_at":"2026-11-27T06:36:25.189280+00:00","prev_period_pct":244.44444444444446,"year_on_year_pct":153.0612244897959,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1360405","display_name":"New dwelling completions — Gort-Kinvara, Galway County","region_label":"1360405","unit":"count","geography_id":"lea:1360405","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":28.0,"data_refreshed_at":"2026-11-27T06:36:26.777670+00:00","prev_period_pct":-49.09090909090909,"year_on_year_pct":-62.66666666666667,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1360406","display_name":"New dwelling completions — Conamara South, Galway County","region_label":"1360406","unit":"count","geography_id":"lea:1360406","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":49.0,"data_refreshed_at":"2026-11-27T06:36:28.363503+00:00","prev_period_pct":68.96551724137932,"year_on_year_pct":44.11764705882353,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1360420","display_name":"New dwelling completions — Galway City West, Galway City","region_label":"1360420","unit":"count","geography_id":"lea:1360420","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":42.0,"data_refreshed_at":"2026-11-27T06:36:29.944530+00:00","prev_period_pct":20.0,"year_on_year_pct":-20.754716981132077,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1360421","display_name":"New dwelling completions — Galway City Central, Galway City","region_label":"1360421","unit":"count","geography_id":"lea:1360421","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":37.0,"data_refreshed_at":"2026-11-27T06:36:31.531762+00:00","prev_period_pct":1750.0,"year_on_year_pct":-9.75609756097561,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1360422","display_name":"New dwelling completions — Galway City East, Galway City","region_label":"1360422","unit":"count","geography_id":"lea:1360422","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":135.0,"data_refreshed_at":"2026-11-27T06:36:33.117301+00:00","prev_period_pct":3275.0,"year_on_year_pct":419.2307692307692,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1370400","display_name":"New dwelling completions — Listowel, Kerry","region_label":"1370400","unit":"count","geography_id":"lea:1370400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":13.0,"data_refreshed_at":"2026-11-27T06:36:34.704679+00:00","prev_period_pct":62.5,"year_on_year_pct":-7.142857142857142,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1370401","display_name":"New dwelling completions — Castleisland, Kerry","region_label":"1370401","unit":"count","geography_id":"lea:1370401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":10.0,"data_refreshed_at":"2026-11-27T06:36:36.519718+00:00","prev_period_pct":-9.090909090909092,"year_on_year_pct":100.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1370402","display_name":"New dwelling completions — Killarney, Kerry","region_label":"1370402","unit":"count","geography_id":"lea:1370402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":48.0,"data_refreshed_at":"2026-11-27T06:36:38.097023+00:00","prev_period_pct":-32.3943661971831,"year_on_year_pct":-30.434782608695656,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1370403","display_name":"New dwelling completions — Kenmare, Kerry","region_label":"1370403","unit":"count","geography_id":"lea:1370403","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":41.0,"data_refreshed_at":"2026-11-27T06:36:39.679491+00:00","prev_period_pct":5.128205128205128,"year_on_year_pct":51.85185185185185,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1370404","display_name":"New dwelling completions — Corca Dhuibhne, Kerry","region_label":"1370404","unit":"count","geography_id":"lea:1370404","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":19.0,"data_refreshed_at":"2026-11-27T06:36:41.260808+00:00","prev_period_pct":-32.142857142857146,"year_on_year_pct":-5.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1370405","display_name":"New dwelling completions — Tralee, Kerry","region_label":"1370405","unit":"count","geography_id":"lea:1370405","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":23.0,"data_refreshed_at":"2026-11-27T06:36:42.847132+00:00","prev_period_pct":-36.11111111111111,"year_on_year_pct":-60.3448275862069,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1380400","display_name":"New dwelling completions — Maynooth, Kildare","region_label":"1380400","unit":"count","geography_id":"lea:1380400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":47.0,"data_refreshed_at":"2026-11-27T06:36:44.424433+00:00","prev_period_pct":62.06896551724138,"year_on_year_pct":235.71428571428572,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1380401","display_name":"New dwelling completions — Celbridge, Kildare","region_label":"1380401","unit":"count","geography_id":"lea:1380401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":69.0,"data_refreshed_at":"2026-11-27T06:36:46.005311+00:00","prev_period_pct":43.75,"year_on_year_pct":6800.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1380402","display_name":"New dwelling completions — Naas, Kildare","region_label":"1380402","unit":"count","geography_id":"lea:1380402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":104.0,"data_refreshed_at":"2026-11-27T06:36:47.584465+00:00","prev_period_pct":31.645569620253166,"year_on_year_pct":20.930232558139537,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1380403","display_name":"New dwelling completions — Athy, Kildare","region_label":"1380403","unit":"count","geography_id":"lea:1380403","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":80.0,"data_refreshed_at":"2026-11-27T06:36:49.162956+00:00","prev_period_pct":-24.528301886792452,"year_on_year_pct":-23.076923076923077,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1380404","display_name":"New dwelling completions — Kildare, Kildare","region_label":"1380404","unit":"count","geography_id":"lea:1380404","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":89.0,"data_refreshed_at":"2026-11-27T06:36:50.748707+00:00","prev_period_pct":81.63265306122449,"year_on_year_pct":81.63265306122449,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1380405","display_name":"New dwelling completions — Clane, Kildare","region_label":"1380405","unit":"count","geography_id":"lea:1380405","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":87.0,"data_refreshed_at":"2026-11-27T06:36:52.328018+00:00","prev_period_pct":19.17808219178082,"year_on_year_pct":6.097560975609756,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1380406","display_name":"New dwelling completions — Leixlip, Kildare","region_label":"1380406","unit":"count","geography_id":"lea:1380406","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":2.0,"data_refreshed_at":"2026-11-27T06:36:53.911415+00:00","prev_period_pct":-97.53086419753086,"year_on_year_pct":-96.49122807017544,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1380407","display_name":"New dwelling completions — Newbridge, Kildare","region_label":"1380407","unit":"count","geography_id":"lea:1380407","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":95.0,"data_refreshed_at":"2026-11-27T06:36:55.486374+00:00","prev_period_pct":-25.196850393700785,"year_on_year_pct":-8.653846153846153,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1390400","display_name":"New dwelling completions — Castlecomer, Kilkenny","region_label":"1390400","unit":"count","geography_id":"lea:1390400","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":19.0,"data_refreshed_at":"2026-11-27T06:36:57.071044+00:00","prev_period_pct":-20.833333333333336,"year_on_year_pct":72.72727272727273,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1390401","display_name":"New dwelling completions — Kilkenny, Kilkenny","region_label":"1390401","unit":"count","geography_id":"lea:1390401","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":43.0,"data_refreshed_at":"2026-11-27T06:36:58.655676+00:00","prev_period_pct":-4.444444444444445,"year_on_year_pct":-14.000000000000002,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1390402","display_name":"New dwelling completions — Piltown, Kilkenny","region_label":"1390402","unit":"count","geography_id":"lea:1390402","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":62.0,"data_refreshed_at":"2026-11-27T06:37:00.247656+00:00","prev_period_pct":-7.462686567164178,"year_on_year_pct":1140.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions_lea_1390403","display_name":"New dwelling completions — Callan-Thomastown, Kilkenny","region_label":"1390403","unit":"count","geography_id":"lea:1390403","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":33.0,"data_refreshed_at":"2026-11-27T06:37:01.835969+00:00","prev_period_pct":-8.333333333333332,"year_on_year_pct":83.33333333333334,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"A single scheme can dominate an LEA's quarter","body":"A Local Electoral Area is far smaller than a county, so one apartment or housing scheme finishing can multiply a quarter's total on its own. Percentage changes at this level are large and ordinary, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is meaningful to compare.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"coverage","severity":"info","label":"This LEA figure may not sum exactly to its council's own total","body":"Summing every LEA in a county for a quarter does not always equal that council's own published completions total for the same quarter (checked directly across the full published history: it matches exactly about 70% of the time). Most mismatches are within 1-2 dwellings, plausibly a boundary-area completion geocoded to a different LEA than its county tabulation uses; a handful of quarters differ by dozens. Both figures are CSO's own published data, evidently produced by independent processes that do not always agree — neither is adjusted to match the other here.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":true,"stats":null}],"group_name":null,"facets":null,"group_key":null},{"country":"ie","series_key":"completions:carlow-county-council","display_name":"New dwelling completions — carlow-county-council","region_label":"carlow-county-council","unit":"count","geography_id":"la:carlow-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":57.0,"data_refreshed_at":"2026-11-27T06:30:03.581171+00:00","prev_period_pct":-42.42424242424242,"year_on_year_pct":21.27659574468085,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_carlow-county-council","label":"Single house","latest_value":18.0,"year_on_year_pct":-14.285714285714285,"unit":"count","display_name":"Single house — Carlow County Council","region_label":"carlow-county-council","geography_id":"la:carlow-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:30:03.581171+00:00","prev_period_pct":-18.181818181818183,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_carlow-county-council","label":"Scheme house","latest_value":13.0,"year_on_year_pct":-50.0,"unit":"count","display_name":"Scheme house — Carlow County Council","region_label":"carlow-county-council","geography_id":"la:carlow-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:30:55.719555+00:00","prev_period_pct":-82.66666666666667,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_carlow-county-council","label":"Apartment","latest_value":26.0,"year_on_year_pct":null,"unit":"count","display_name":"Apartment — Carlow County Council","region_label":"carlow-county-council","geography_id":"la:carlow-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:31:47.635637+00:00","prev_period_pct":1200.0,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:cavan-county-council","display_name":"New dwelling completions — cavan-county-council","region_label":"cavan-county-council","unit":"count","geography_id":"la:cavan-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":95.0,"data_refreshed_at":"2026-11-27T06:30:05.253700+00:00","prev_period_pct":-12.037037037037036,"year_on_year_pct":-17.391304347826086,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_cavan-county-council","label":"Single house","latest_value":26.0,"year_on_year_pct":-36.58536585365854,"unit":"count","display_name":"Single house — Cavan County Council","region_label":"cavan-county-council","geography_id":"la:cavan-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:30:05.253700+00:00","prev_period_pct":-23.52941176470588,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_cavan-county-council","label":"Scheme house","latest_value":65.0,"year_on_year_pct":-9.722222222222223,"unit":"count","display_name":"Scheme house — Cavan County Council","region_label":"cavan-county-council","geography_id":"la:cavan-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:30:57.395161+00:00","prev_period_pct":-4.411764705882353,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_cavan-county-council","label":"Apartment","latest_value":4.0,"year_on_year_pct":100.0,"unit":"count","display_name":"Apartment — Cavan County Council","region_label":"cavan-county-council","geography_id":"la:cavan-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:31:49.307809+00:00","prev_period_pct":-33.33333333333333,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:clare-county-council","display_name":"New dwelling completions — clare-county-council","region_label":"clare-county-council","unit":"count","geography_id":"la:clare-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":162.0,"data_refreshed_at":"2026-11-27T06:30:06.929242+00:00","prev_period_pct":-8.98876404494382,"year_on_year_pct":11.724137931034482,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_clare-county-council","label":"Single house","latest_value":72.0,"year_on_year_pct":14.285714285714285,"unit":"count","display_name":"Single house — Clare County Council","region_label":"clare-county-council","geography_id":"la:clare-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:30:06.929242+00:00","prev_period_pct":5.88235294117647,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_clare-county-council","label":"Scheme house","latest_value":68.0,"year_on_year_pct":-15.0,"unit":"count","display_name":"Scheme house — Clare County Council","region_label":"clare-county-council","geography_id":"la:clare-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:30:59.071056+00:00","prev_period_pct":-26.881720430107524,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_clare-county-council","label":"Apartment","latest_value":22.0,"year_on_year_pct":1000.0,"unit":"count","display_name":"Apartment — Clare County Council","region_label":"clare-county-council","geography_id":"la:clare-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:31:50.980858+00:00","prev_period_pct":29.411764705882355,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:cork-city-council","display_name":"New dwelling completions — cork-city-council","region_label":"cork-city-council","unit":"count","geography_id":"la:cork-city-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":643.0,"data_refreshed_at":"2026-11-27T06:30:08.601514+00:00","prev_period_pct":64.87179487179488,"year_on_year_pct":29.898989898989896,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_cork-city-council","label":"Single house","latest_value":10.0,"year_on_year_pct":-33.33333333333333,"unit":"count","display_name":"Single house — Cork City Council","region_label":"cork-city-council","geography_id":"la:cork-city-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:30:08.601514+00:00","prev_period_pct":-23.076923076923077,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_cork-city-council","label":"Scheme house","latest_value":235.0,"year_on_year_pct":-36.31436314363143,"unit":"count","display_name":"Scheme house — Cork City Council","region_label":"cork-city-council","geography_id":"la:cork-city-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:31:00.741364+00:00","prev_period_pct":-6.374501992031872,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_cork-city-council","label":"Apartment","latest_value":398.0,"year_on_year_pct":258.55855855855856,"unit":"count","display_name":"Apartment — Cork City Council","region_label":"cork-city-council","geography_id":"la:cork-city-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:31:52.650561+00:00","prev_period_pct":215.87301587301587,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:cork-county-council","display_name":"New dwelling completions — cork-county-council","region_label":"cork-county-council","unit":"count","geography_id":"la:cork-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":698.0,"data_refreshed_at":"2026-11-27T06:30:10.272959+00:00","prev_period_pct":37.13163064833006,"year_on_year_pct":29.259259259259256,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_cork-county-council","label":"Single house","latest_value":188.0,"year_on_year_pct":18.9873417721519,"unit":"count","display_name":"Single house — Cork County Council","region_label":"cork-county-council","geography_id":"la:cork-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:30:10.272959+00:00","prev_period_pct":13.939393939393941,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_cork-county-council","label":"Scheme house","latest_value":496.0,"year_on_year_pct":35.89041095890411,"unit":"count","display_name":"Scheme house — Cork County Council","region_label":"cork-county-council","geography_id":"la:cork-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:31:02.446237+00:00","prev_period_pct":50.303030303030305,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_cork-county-council","label":"Apartment","latest_value":14.0,"year_on_year_pct":-17.647058823529413,"unit":"count","display_name":"Apartment — Cork County Council","region_label":"cork-county-council","geography_id":"la:cork-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:31:54.318977+00:00","prev_period_pct":0.0,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:donegal-county-council","display_name":"New dwelling completions — donegal-county-council","region_label":"donegal-county-council","unit":"count","geography_id":"la:donegal-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":220.0,"data_refreshed_at":"2026-11-27T06:30:11.946910+00:00","prev_period_pct":7.8431372549019605,"year_on_year_pct":27.167630057803464,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_donegal-county-council","label":"Single house","latest_value":118.0,"year_on_year_pct":3.508771929824561,"unit":"count","display_name":"Single house — Donegal County Council","region_label":"donegal-county-council","geography_id":"la:donegal-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:30:11.946910+00:00","prev_period_pct":14.563106796116504,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_donegal-county-council","label":"Scheme house","latest_value":95.0,"year_on_year_pct":90.0,"unit":"count","display_name":"Scheme house — Donegal County Council","region_label":"donegal-county-council","geography_id":"la:donegal-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:31:04.117901+00:00","prev_period_pct":0.0,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_donegal-county-council","label":"Apartment","latest_value":7.0,"year_on_year_pct":-22.22222222222222,"unit":"count","display_name":"Apartment — Donegal County Council","region_label":"donegal-county-council","geography_id":"la:donegal-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:31:55.989023+00:00","prev_period_pct":16.666666666666664,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:dublin-city-council","display_name":"New dwelling completions — dublin-city-council","region_label":"dublin-city-council","unit":"count","geography_id":"la:dublin-city-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":1214.0,"data_refreshed_at":"2026-11-27T06:30:13.615801+00:00","prev_period_pct":-5.15625,"year_on_year_pct":34.14364640883978,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_dublin-city-council","label":"Single house","latest_value":26.0,"year_on_year_pct":13.043478260869565,"unit":"count","display_name":"Single house — Dublin City Council","region_label":"dublin-city-council","geography_id":"la:dublin-city-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:30:13.615801+00:00","prev_period_pct":36.84210526315789,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_dublin-city-council","label":"Scheme house","latest_value":127.0,"year_on_year_pct":2440.0,"unit":"count","display_name":"Scheme house — Dublin City Council","region_label":"dublin-city-council","geography_id":"la:dublin-city-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:31:05.786002+00:00","prev_period_pct":39.56043956043956,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_dublin-city-council","label":"Apartment","latest_value":1061.0,"year_on_year_pct":20.980615735461804,"unit":"count","display_name":"Apartment — Dublin City Council","region_label":"dublin-city-council","geography_id":"la:dublin-city-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:31:57.658675+00:00","prev_period_pct":-9.316239316239317,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:dun-laoghaire-rathdown-county-council","display_name":"New dwelling completions — dun-laoghaire-rathdown-county-council","region_label":"dun-laoghaire-rathdown-county-council","unit":"count","geography_id":"la:dun-laoghaire-rathdown-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":741.0,"data_refreshed_at":"2026-11-27T06:30:15.301664+00:00","prev_period_pct":141.36807817589576,"year_on_year_pct":51.84426229508197,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_dun-laoghaire-rathdown-county-council","label":"Single house","latest_value":11.0,"year_on_year_pct":-21.428571428571427,"unit":"count","display_name":"Single house — Dún Laoghaire Rathdown County Council","region_label":"dun-laoghaire-rathdown-county-council","geography_id":"la:dun-laoghaire-rathdown-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:30:15.301664+00:00","prev_period_pct":37.5,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_dun-laoghaire-rathdown-county-council","label":"Scheme house","latest_value":226.0,"year_on_year_pct":143.01075268817206,"unit":"count","display_name":"Scheme house — Dún Laoghaire Rathdown County Council","region_label":"dun-laoghaire-rathdown-county-council","geography_id":"la:dun-laoghaire-rathdown-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:31:07.469279+00:00","prev_period_pct":165.8823529411765,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_dun-laoghaire-rathdown-county-council","label":"Apartment","latest_value":504.0,"year_on_year_pct":32.28346456692913,"unit":"count","display_name":"Apartment — Dún Laoghaire Rathdown County Council","region_label":"dun-laoghaire-rathdown-county-council","geography_id":"la:dun-laoghaire-rathdown-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:31:59.327029+00:00","prev_period_pct":135.5140186915888,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:fingal-county-council","display_name":"New dwelling completions — fingal-county-council","region_label":"fingal-county-council","unit":"count","geography_id":"la:fingal-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":972.0,"data_refreshed_at":"2026-11-27T06:30:16.977280+00:00","prev_period_pct":-4.705882352941177,"year_on_year_pct":28.232189973614773,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_fingal-county-council","label":"Single house","latest_value":22.0,"year_on_year_pct":-4.3478260869565215,"unit":"count","display_name":"Single house — Fingal County Council","region_label":"fingal-county-council","geography_id":"la:fingal-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:30:16.977280+00:00","prev_period_pct":46.666666666666664,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_fingal-county-council","label":"Scheme house","latest_value":564.0,"year_on_year_pct":98.59154929577466,"unit":"count","display_name":"Scheme house — Fingal County Council","region_label":"fingal-county-council","geography_id":"la:fingal-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:31:09.144124+00:00","prev_period_pct":2.35934664246824,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_fingal-county-council","label":"Apartment","latest_value":386.0,"year_on_year_pct":-14.412416851441243,"unit":"count","display_name":"Apartment — Fingal County Council","region_label":"fingal-county-council","geography_id":"la:fingal-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:32:01.008734+00:00","prev_period_pct":-14.977973568281937,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:galway-city-council","display_name":"New dwelling completions — galway-city-council","region_label":"galway-city-council","unit":"count","geography_id":"la:galway-city-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":216.0,"data_refreshed_at":"2026-11-27T06:30:18.661166+00:00","prev_period_pct":426.82926829268297,"year_on_year_pct":80.0,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_galway-city-council","label":"Single house","latest_value":11.0,"year_on_year_pct":-26.666666666666668,"unit":"count","display_name":"Single house — Galway City Council","region_label":"galway-city-council","geography_id":"la:galway-city-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:30:18.661166+00:00","prev_period_pct":57.14285714285714,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_galway-city-council","label":"Scheme house","latest_value":59.0,"year_on_year_pct":-6.349206349206349,"unit":"count","display_name":"Scheme house — Galway City Council","region_label":"galway-city-council","geography_id":"la:galway-city-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:31:10.817399+00:00","prev_period_pct":268.75,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_galway-city-council","label":"Apartment","latest_value":146.0,"year_on_year_pct":247.61904761904762,"unit":"count","display_name":"Apartment — Galway City Council","region_label":"galway-city-council","geography_id":"la:galway-city-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:32:02.681373+00:00","prev_period_pct":711.1111111111111,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:galway-county-council","display_name":"New dwelling completions — galway-county-council","region_label":"galway-county-council","unit":"count","geography_id":"la:galway-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":334.0,"data_refreshed_at":"2026-11-27T06:30:20.328735+00:00","prev_period_pct":40.92827004219409,"year_on_year_pct":20.577617328519857,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_galway-county-council","label":"Single house","latest_value":154.0,"year_on_year_pct":19.379844961240313,"unit":"count","display_name":"Single house — Galway County Council","region_label":"galway-county-council","geography_id":"la:galway-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:30:20.328735+00:00","prev_period_pct":21.25984251968504,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_galway-county-council","label":"Scheme house","latest_value":134.0,"year_on_year_pct":-6.293706293706294,"unit":"count","display_name":"Scheme house — Galway County Council","region_label":"galway-county-council","geography_id":"la:galway-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:31:12.485319+00:00","prev_period_pct":78.66666666666666,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_galway-county-council","label":"Apartment","latest_value":46.0,"year_on_year_pct":819.9999999999999,"unit":"count","display_name":"Apartment — Galway County Council","region_label":"galway-county-council","geography_id":"la:galway-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:32:04.350432+00:00","prev_period_pct":31.428571428571427,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:kerry-county-council","display_name":"New dwelling completions — kerry-county-council","region_label":"kerry-county-council","unit":"count","geography_id":"la:kerry-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":154.0,"data_refreshed_at":"2026-11-27T06:30:22.000983+00:00","prev_period_pct":-20.207253886010363,"year_on_year_pct":-20.207253886010363,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_kerry-county-council","label":"Single house","latest_value":66.0,"year_on_year_pct":-5.714285714285714,"unit":"count","display_name":"Single house — Kerry County Council","region_label":"kerry-county-council","geography_id":"la:kerry-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:30:22.000983+00:00","prev_period_pct":8.19672131147541,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_kerry-county-council","label":"Scheme house","latest_value":60.0,"year_on_year_pct":-36.17021276595745,"unit":"count","display_name":"Scheme house — Kerry County Council","region_label":"kerry-county-council","geography_id":"la:kerry-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:31:14.155405+00:00","prev_period_pct":-42.857142857142854,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_kerry-county-council","label":"Apartment","latest_value":28.0,"year_on_year_pct":-3.4482758620689653,"unit":"count","display_name":"Apartment — Kerry County Council","region_label":"kerry-county-council","geography_id":"la:kerry-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:32:06.013888+00:00","prev_period_pct":3.7037037037037033,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:kildare-county-council","display_name":"New dwelling completions — kildare-county-council","region_label":"kildare-county-council","unit":"count","geography_id":"la:kildare-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":572.0,"data_refreshed_at":"2026-11-27T06:30:23.774539+00:00","prev_period_pct":-3.3783783783783785,"year_on_year_pct":15.090543259557343,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_kildare-county-council","label":"Single house","latest_value":45.0,"year_on_year_pct":28.57142857142857,"unit":"count","display_name":"Single house — Kildare County Council","region_label":"kildare-county-council","geography_id":"la:kildare-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:30:23.774539+00:00","prev_period_pct":7.142857142857142,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_kildare-county-council","label":"Scheme house","latest_value":361.0,"year_on_year_pct":-20.309050772626932,"unit":"count","display_name":"Scheme house — Kildare County Council","region_label":"kildare-county-council","geography_id":"la:kildare-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:31:15.830474+00:00","prev_period_pct":-13.636363636363635,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_kildare-county-council","label":"Apartment","latest_value":166.0,"year_on_year_pct":1744.4444444444443,"unit":"count","display_name":"Apartment — Kildare County Council","region_label":"kildare-county-council","geography_id":"la:kildare-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:32:07.684780+00:00","prev_period_pct":25.757575757575758,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:kilkenny-county-council","display_name":"New dwelling completions — kilkenny-county-council","region_label":"kilkenny-county-council","unit":"count","geography_id":"la:kilkenny-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":158.0,"data_refreshed_at":"2026-11-27T06:30:25.455193+00:00","prev_period_pct":-8.13953488372093,"year_on_year_pct":88.09523809523809,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_kilkenny-county-council","label":"Single house","latest_value":47.0,"year_on_year_pct":95.83333333333334,"unit":"count","display_name":"Single house — Kilkenny County Council","region_label":"kilkenny-county-council","geography_id":"la:kilkenny-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:30:25.455193+00:00","prev_period_pct":-17.543859649122805,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_kilkenny-county-council","label":"Scheme house","latest_value":109.0,"year_on_year_pct":109.61538461538463,"unit":"count","display_name":"Scheme house — Kilkenny County Council","region_label":"kilkenny-county-council","geography_id":"la:kilkenny-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:31:17.500462+00:00","prev_period_pct":-2.6785714285714284,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_kilkenny-county-council","label":"Apartment","latest_value":2.0,"year_on_year_pct":-75.0,"unit":"count","display_name":"Apartment — Kilkenny County Council","region_label":"kilkenny-county-council","geography_id":"la:kilkenny-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:32:09.351748+00:00","prev_period_pct":-33.33333333333333,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:laois-county-council","display_name":"New dwelling completions — laois-county-council","region_label":"laois-county-council","unit":"count","geography_id":"la:laois-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":160.0,"data_refreshed_at":"2026-11-27T06:30:27.137194+00:00","prev_period_pct":-23.076923076923077,"year_on_year_pct":-30.735930735930733,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_laois-county-council","label":"Single house","latest_value":32.0,"year_on_year_pct":-3.0303030303030303,"unit":"count","display_name":"Single house — Laois County Council","region_label":"laois-county-council","geography_id":"la:laois-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:30:27.137194+00:00","prev_period_pct":-23.809523809523807,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_laois-county-council","label":"Scheme house","latest_value":128.0,"year_on_year_pct":-19.49685534591195,"unit":"count","display_name":"Scheme house — Laois County Council","region_label":"laois-county-council","geography_id":"la:laois-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:31:19.177286+00:00","prev_period_pct":-17.419354838709676,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_laois-county-council","label":"Apartment","latest_value":0.0,"year_on_year_pct":-100.0,"unit":"count","display_name":"Apartment — Laois County Council","region_label":"laois-county-council","geography_id":"la:laois-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:32:11.022127+00:00","prev_period_pct":-100.0,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:leitrim-county-council","display_name":"New dwelling completions — leitrim-county-council","region_label":"leitrim-county-council","unit":"count","geography_id":"la:leitrim-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":22.0,"data_refreshed_at":"2026-11-27T06:30:28.835222+00:00","prev_period_pct":-31.25,"year_on_year_pct":29.411764705882355,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_leitrim-county-council","label":"Single house","latest_value":20.0,"year_on_year_pct":66.66666666666666,"unit":"count","display_name":"Single house — Leitrim County Council","region_label":"leitrim-county-council","geography_id":"la:leitrim-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:30:28.835222+00:00","prev_period_pct":66.66666666666666,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_leitrim-county-council","label":"Scheme house","latest_value":0.0,"year_on_year_pct":-100.0,"unit":"count","display_name":"Scheme house — Leitrim County Council","region_label":"leitrim-county-council","geography_id":"la:leitrim-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:31:20.851262+00:00","prev_period_pct":-100.0,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_leitrim-county-council","label":"Apartment","latest_value":2.0,"year_on_year_pct":null,"unit":"count","display_name":"Apartment — Leitrim County Council","region_label":"leitrim-county-council","geography_id":"la:leitrim-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:32:12.691053+00:00","prev_period_pct":-66.66666666666666,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:limerick-city-and-county-council","display_name":"New dwelling completions — limerick-city-and-county-council","region_label":"limerick-city-and-county-council","unit":"count","geography_id":"la:limerick-city-and-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":236.0,"data_refreshed_at":"2026-11-27T06:30:30.513382+00:00","prev_period_pct":27.56756756756757,"year_on_year_pct":1.2875536480686696,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_limerick-city-and-county-council","label":"Single house","latest_value":60.0,"year_on_year_pct":-22.07792207792208,"unit":"count","display_name":"Single house — Limerick City & County Council","region_label":"limerick-city-and-county-council","geography_id":"la:limerick-city-and-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:30:30.513382+00:00","prev_period_pct":-9.090909090909092,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_limerick-city-and-county-council","label":"Scheme house","latest_value":150.0,"year_on_year_pct":20.967741935483872,"unit":"count","display_name":"Scheme house — Limerick City & County Council","region_label":"limerick-city-and-county-council","geography_id":"la:limerick-city-and-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:31:22.523389+00:00","prev_period_pct":66.66666666666666,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_limerick-city-and-county-council","label":"Apartment","latest_value":26.0,"year_on_year_pct":-18.75,"unit":"count","display_name":"Apartment — Limerick City & County Council","region_label":"limerick-city-and-county-council","geography_id":"la:limerick-city-and-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:32:14.381479+00:00","prev_period_pct":-10.344827586206897,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:longford-county-council","display_name":"New dwelling completions — longford-county-council","region_label":"longford-county-council","unit":"count","geography_id":"la:longford-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":67.0,"data_refreshed_at":"2026-11-27T06:30:32.199414+00:00","prev_period_pct":4.6875,"year_on_year_pct":91.42857142857143,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_longford-county-council","label":"Single house","latest_value":14.0,"year_on_year_pct":-41.66666666666667,"unit":"count","display_name":"Single house — Longford County Council","region_label":"longford-county-council","geography_id":"la:longford-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:30:32.199414+00:00","prev_period_pct":-39.130434782608695,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_longford-county-council","label":"Scheme house","latest_value":44.0,"year_on_year_pct":null,"unit":"count","display_name":"Scheme house — Longford County Council","region_label":"longford-county-council","geography_id":"la:longford-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:31:24.197875+00:00","prev_period_pct":15.789473684210526,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_longford-county-council","label":"Apartment","latest_value":9.0,"year_on_year_pct":-18.181818181818183,"unit":"count","display_name":"Apartment — Longford County Council","region_label":"longford-county-council","geography_id":"la:longford-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:32:16.054235+00:00","prev_period_pct":200.0,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:louth-county-council","display_name":"New dwelling completions — louth-county-council","region_label":"louth-county-council","unit":"count","geography_id":"la:louth-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":370.0,"data_refreshed_at":"2026-11-27T06:30:33.876178+00:00","prev_period_pct":-22.268907563025213,"year_on_year_pct":13.846153846153847,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_louth-county-council","label":"Single house","latest_value":33.0,"year_on_year_pct":0.0,"unit":"count","display_name":"Single house — Louth County Council","region_label":"louth-county-council","geography_id":"la:louth-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:30:33.876178+00:00","prev_period_pct":22.22222222222222,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_louth-county-council","label":"Scheme house","latest_value":302.0,"year_on_year_pct":49.504950495049506,"unit":"count","display_name":"Scheme house — Louth County Council","region_label":"louth-county-council","geography_id":"la:louth-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:31:25.870880+00:00","prev_period_pct":-21.354166666666664,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_louth-county-council","label":"Apartment","latest_value":35.0,"year_on_year_pct":-61.111111111111114,"unit":"count","display_name":"Apartment — Louth County Council","region_label":"louth-county-council","geography_id":"la:louth-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:32:17.723857+00:00","prev_period_pct":-46.15384615384615,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:mayo-county-council","display_name":"New dwelling completions — mayo-county-council","region_label":"mayo-county-council","unit":"count","geography_id":"la:mayo-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":145.0,"data_refreshed_at":"2026-11-27T06:30:35.565190+00:00","prev_period_pct":26.08695652173913,"year_on_year_pct":17.88617886178862,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_mayo-county-council","label":"Single house","latest_value":79.0,"year_on_year_pct":23.4375,"unit":"count","display_name":"Single house — Mayo County Council","region_label":"mayo-county-council","geography_id":"la:mayo-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:30:35.565190+00:00","prev_period_pct":33.89830508474576,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_mayo-county-council","label":"Scheme house","latest_value":65.0,"year_on_year_pct":75.67567567567568,"unit":"count","display_name":"Scheme house — Mayo County Council","region_label":"mayo-county-council","geography_id":"la:mayo-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:31:27.542735+00:00","prev_period_pct":35.41666666666667,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_mayo-county-council","label":"Apartment","latest_value":1.0,"year_on_year_pct":-95.45454545454545,"unit":"count","display_name":"Apartment — Mayo County Council","region_label":"mayo-county-council","geography_id":"la:mayo-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:32:19.394116+00:00","prev_period_pct":-87.5,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:meath-county-council","display_name":"New dwelling completions — meath-county-council","region_label":"meath-county-council","unit":"count","geography_id":"la:meath-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":584.0,"data_refreshed_at":"2026-11-27T06:30:37.249220+00:00","prev_period_pct":26.68112798264642,"year_on_year_pct":-5.501618122977346,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_meath-county-council","label":"Single house","latest_value":80.0,"year_on_year_pct":-11.11111111111111,"unit":"count","display_name":"Single house — Meath County Council","region_label":"meath-county-council","geography_id":"la:meath-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:30:37.249220+00:00","prev_period_pct":17.647058823529413,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_meath-county-council","label":"Scheme house","latest_value":411.0,"year_on_year_pct":-7.847533632286996,"unit":"count","display_name":"Scheme house — Meath County Council","region_label":"meath-county-council","geography_id":"la:meath-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:31:29.217532+00:00","prev_period_pct":14.804469273743019,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_meath-county-council","label":"Apartment","latest_value":93.0,"year_on_year_pct":13.414634146341465,"unit":"count","display_name":"Apartment — Meath County Council","region_label":"meath-county-council","geography_id":"la:meath-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:32:21.063465+00:00","prev_period_pct":165.71428571428572,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:monaghan-county-council","display_name":"New dwelling completions — monaghan-county-council","region_label":"monaghan-county-council","unit":"count","geography_id":"la:monaghan-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":67.0,"data_refreshed_at":"2026-11-27T06:30:38.926710+00:00","prev_period_pct":-27.173913043478258,"year_on_year_pct":-23.863636363636363,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_monaghan-county-council","label":"Single house","latest_value":44.0,"year_on_year_pct":7.317073170731707,"unit":"count","display_name":"Single house — Monaghan County Council","region_label":"monaghan-county-council","geography_id":"la:monaghan-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:30:38.926710+00:00","prev_period_pct":2.3255813953488373,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_monaghan-county-council","label":"Scheme house","latest_value":20.0,"year_on_year_pct":-52.38095238095239,"unit":"count","display_name":"Scheme house — Monaghan County Council","region_label":"monaghan-county-council","geography_id":"la:monaghan-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:31:30.887275+00:00","prev_period_pct":-55.55555555555556,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_monaghan-county-council","label":"Apartment","latest_value":3.0,"year_on_year_pct":-40.0,"unit":"count","display_name":"Apartment — Monaghan County Council","region_label":"monaghan-county-council","geography_id":"la:monaghan-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:32:22.735582+00:00","prev_period_pct":-25.0,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:offaly-county-council","display_name":"New dwelling completions — offaly-county-council","region_label":"offaly-county-council","unit":"count","geography_id":"la:offaly-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":122.0,"data_refreshed_at":"2026-11-27T06:30:40.603659+00:00","prev_period_pct":-15.862068965517242,"year_on_year_pct":62.66666666666667,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_offaly-county-council","label":"Single house","latest_value":35.0,"year_on_year_pct":12.903225806451612,"unit":"count","display_name":"Single house — Offaly County Council","region_label":"offaly-county-council","geography_id":"la:offaly-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:30:40.603659+00:00","prev_period_pct":-5.405405405405405,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_offaly-county-council","label":"Scheme house","latest_value":82.0,"year_on_year_pct":95.23809523809523,"unit":"count","display_name":"Scheme house — Offaly County Council","region_label":"offaly-county-council","geography_id":"la:offaly-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:31:32.557976+00:00","prev_period_pct":-9.89010989010989,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_offaly-county-council","label":"Apartment","latest_value":5.0,"year_on_year_pct":150.0,"unit":"count","display_name":"Apartment — Offaly County Council","region_label":"offaly-county-council","geography_id":"la:offaly-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:32:24.436754+00:00","prev_period_pct":-70.58823529411765,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:roscommon-county-council","display_name":"New dwelling completions — roscommon-county-council","region_label":"roscommon-county-council","unit":"count","geography_id":"la:roscommon-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":82.0,"data_refreshed_at":"2026-11-27T06:30:42.295103+00:00","prev_period_pct":10.81081081081081,"year_on_year_pct":28.125,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_roscommon-county-council","label":"Single house","latest_value":33.0,"year_on_year_pct":10.0,"unit":"count","display_name":"Single house — Roscommon County Council","region_label":"roscommon-county-council","geography_id":"la:roscommon-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:30:42.295103+00:00","prev_period_pct":0.0,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_roscommon-county-council","label":"Scheme house","latest_value":47.0,"year_on_year_pct":42.42424242424242,"unit":"count","display_name":"Scheme house — Roscommon County Council","region_label":"roscommon-county-council","geography_id":"la:roscommon-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:31:34.239945+00:00","prev_period_pct":30.555555555555557,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_roscommon-county-council","label":"Apartment","latest_value":2.0,"year_on_year_pct":100.0,"unit":"count","display_name":"Apartment — Roscommon County Council","region_label":"roscommon-county-council","geography_id":"la:roscommon-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:32:26.109487+00:00","prev_period_pct":-60.0,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:sligo-county-council","display_name":"New dwelling completions — sligo-county-council","region_label":"sligo-county-council","unit":"count","geography_id":"la:sligo-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":77.0,"data_refreshed_at":"2026-11-27T06:30:43.968775+00:00","prev_period_pct":-31.25,"year_on_year_pct":-34.18803418803419,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_sligo-county-council","label":"Single house","latest_value":32.0,"year_on_year_pct":10.344827586206897,"unit":"count","display_name":"Single house — Sligo County Council","region_label":"sligo-county-council","geography_id":"la:sligo-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:30:43.968775+00:00","prev_period_pct":28.000000000000004,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_sligo-county-council","label":"Scheme house","latest_value":45.0,"year_on_year_pct":-48.86363636363637,"unit":"count","display_name":"Scheme house — Sligo County Council","region_label":"sligo-county-council","geography_id":"la:sligo-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:31:35.915592+00:00","prev_period_pct":-47.05882352941176,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_sligo-county-council","label":"Apartment","latest_value":0.0,"year_on_year_pct":null,"unit":"count","display_name":"Apartment — Sligo County Council","region_label":"sligo-county-council","geography_id":"la:sligo-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:32:27.786192+00:00","prev_period_pct":-100.0,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:south-dublin-county-council","display_name":"New dwelling completions — south-dublin-county-council","region_label":"south-dublin-county-council","unit":"count","geography_id":"la:south-dublin-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":793.0,"data_refreshed_at":"2026-11-27T06:30:45.647108+00:00","prev_period_pct":38.39441535776614,"year_on_year_pct":-32.10616438356164,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_south-dublin-county-council","label":"Single house","latest_value":10.0,"year_on_year_pct":-16.666666666666664,"unit":"count","display_name":"Single house — South Dublin County Council","region_label":"south-dublin-county-council","geography_id":"la:south-dublin-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:30:45.647108+00:00","prev_period_pct":66.66666666666666,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_south-dublin-county-council","label":"Scheme house","latest_value":423.0,"year_on_year_pct":14.016172506738545,"unit":"count","display_name":"Scheme house — South Dublin County Council","region_label":"south-dublin-county-council","geography_id":"la:south-dublin-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:31:37.587293+00:00","prev_period_pct":6.015037593984962,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_south-dublin-county-council","label":"Apartment","latest_value":360.0,"year_on_year_pct":-54.14012738853503,"unit":"count","display_name":"Apartment — South Dublin County Council","region_label":"south-dublin-county-council","geography_id":"la:south-dublin-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:32:29.455836+00:00","prev_period_pct":114.28571428571428,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:tipperary-county-council","display_name":"New dwelling completions — tipperary-county-council","region_label":"tipperary-county-council","unit":"count","geography_id":"la:tipperary-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":148.0,"data_refreshed_at":"2026-11-27T06:30:47.321167+00:00","prev_period_pct":-12.42603550295858,"year_on_year_pct":-32.11009174311927,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_tipperary-county-council","label":"Single house","latest_value":52.0,"year_on_year_pct":-5.454545454545454,"unit":"count","display_name":"Single house — Tipperary County Council","region_label":"tipperary-county-council","geography_id":"la:tipperary-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:30:47.321167+00:00","prev_period_pct":-3.7037037037037033,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_tipperary-county-council","label":"Scheme house","latest_value":91.0,"year_on_year_pct":-38.513513513513516,"unit":"count","display_name":"Scheme house — Tipperary County Council","region_label":"tipperary-county-council","geography_id":"la:tipperary-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:31:39.258000+00:00","prev_period_pct":-1.0869565217391304,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_tipperary-county-council","label":"Apartment","latest_value":5.0,"year_on_year_pct":-66.66666666666666,"unit":"count","display_name":"Apartment — Tipperary County Council","region_label":"tipperary-county-council","geography_id":"la:tipperary-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:32:31.124167+00:00","prev_period_pct":-78.26086956521739,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:waterford-city-and-county-council","display_name":"New dwelling completions — waterford-city-and-county-council","region_label":"waterford-city-and-county-council","unit":"count","geography_id":"la:waterford-city-and-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":241.0,"data_refreshed_at":"2026-11-27T06:30:48.998936+00:00","prev_period_pct":59.60264900662252,"year_on_year_pct":14.218009478672986,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_waterford-city-and-county-council","label":"Single house","latest_value":32.0,"year_on_year_pct":-8.571428571428571,"unit":"count","display_name":"Single house — Waterford City & County Council","region_label":"waterford-city-and-county-council","geography_id":"la:waterford-city-and-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:30:48.998936+00:00","prev_period_pct":-17.94871794871795,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_waterford-city-and-county-council","label":"Scheme house","latest_value":191.0,"year_on_year_pct":23.225806451612904,"unit":"count","display_name":"Scheme house — Waterford City & County Council","region_label":"waterford-city-and-county-council","geography_id":"la:waterford-city-and-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:31:40.934846+00:00","prev_period_pct":87.25490196078431,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_waterford-city-and-county-council","label":"Apartment","latest_value":18.0,"year_on_year_pct":-14.285714285714285,"unit":"count","display_name":"Apartment — Waterford City & County Council","region_label":"waterford-city-and-county-council","geography_id":"la:waterford-city-and-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:32:32.793261+00:00","prev_period_pct":80.0,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:westmeath-county-council","display_name":"New dwelling completions — westmeath-county-council","region_label":"westmeath-county-council","unit":"count","geography_id":"la:westmeath-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":224.0,"data_refreshed_at":"2026-11-27T06:30:50.677859+00:00","prev_period_pct":33.33333333333333,"year_on_year_pct":0.4484304932735426,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_westmeath-county-council","label":"Single house","latest_value":42.0,"year_on_year_pct":7.6923076923076925,"unit":"count","display_name":"Single house — Westmeath County Council","region_label":"westmeath-county-council","geography_id":"la:westmeath-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:30:50.677859+00:00","prev_period_pct":-19.230769230769234,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_westmeath-county-council","label":"Scheme house","latest_value":167.0,"year_on_year_pct":29.457364341085274,"unit":"count","display_name":"Scheme house — Westmeath County Council","region_label":"westmeath-county-council","geography_id":"la:westmeath-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:31:42.607440+00:00","prev_period_pct":65.34653465346535,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_westmeath-county-council","label":"Apartment","latest_value":15.0,"year_on_year_pct":-72.72727272727273,"unit":"count","display_name":"Apartment — Westmeath County Council","region_label":"westmeath-county-council","geography_id":"la:westmeath-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:32:34.463404+00:00","prev_period_pct":0.0,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:wexford-county-council","display_name":"New dwelling completions — wexford-county-council","region_label":"wexford-county-council","unit":"count","geography_id":"la:wexford-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":314.0,"data_refreshed_at":"2026-11-27T06:30:52.355544+00:00","prev_period_pct":16.296296296296298,"year_on_year_pct":12.949640287769784,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_wexford-county-council","label":"Single house","latest_value":74.0,"year_on_year_pct":-19.565217391304348,"unit":"count","display_name":"Single house — Wexford County Council","region_label":"wexford-county-council","geography_id":"la:wexford-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:30:52.355544+00:00","prev_period_pct":25.423728813559322,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_wexford-county-council","label":"Scheme house","latest_value":191.0,"year_on_year_pct":4.371584699453552,"unit":"count","display_name":"Scheme house — Wexford County Council","region_label":"wexford-county-council","geography_id":"la:wexford-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:31:44.273676+00:00","prev_period_pct":-1.5463917525773196,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_wexford-county-council","label":"Apartment","latest_value":49.0,"year_on_year_pct":1533.3333333333335,"unit":"count","display_name":"Apartment — Wexford County Council","region_label":"wexford-county-council","geography_id":"la:wexford-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:32:36.129995+00:00","prev_period_pct":188.23529411764704,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"},{"country":"ie","series_key":"completions:wicklow-county-council","display_name":"New dwelling completions — wicklow-county-council","region_label":"wicklow-county-council","unit":"count","geography_id":"la:wicklow-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","latest_value":266.0,"data_refreshed_at":"2026-11-27T06:30:54.041266+00:00","prev_period_pct":34.34343434343434,"year_on_year_pct":-20.833333333333336,"caveats":[{"country":"ie","kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"stats":null},{"country":"ie","kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"stats":null}],"group_name":"New dwelling completions","facets":[{"country":"ie","series_key":"completions_06_wicklow-county-council","label":"Single house","latest_value":41.0,"year_on_year_pct":-24.074074074074073,"unit":"count","display_name":"Single house — Wicklow County Council","region_label":"wicklow-county-council","geography_id":"la:wicklow-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:30:54.041266+00:00","prev_period_pct":0.0,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"}],"order":1,"is_total":false},{"country":"ie","series_key":"completions_07_wicklow-county-council","label":"Scheme house","latest_value":194.0,"year_on_year_pct":-17.094017094017094,"unit":"count","display_name":"Scheme house — Wicklow County Council","region_label":"wicklow-county-council","geography_id":"la:wicklow-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:31:45.944902+00:00","prev_period_pct":37.5886524822695,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"}],"order":2,"is_total":false},{"country":"ie","series_key":"completions_08_wicklow-county-council","label":"Apartment","latest_value":31.0,"year_on_year_pct":-35.41666666666667,"unit":"count","display_name":"Apartment — Wicklow County Council","region_label":"wicklow-county-council","geography_id":"la:wicklow-county-council","stat_key":"completions","periodicity":"quarterly","latest_period":"2026-07-01","data_refreshed_at":"2026-11-27T06:32:37.801207+00:00","prev_period_pct":93.75,"caveats":[{"kind":"data_quality","severity":"info","label":"A completion means an ESB connection","body":"CSO counts a dwelling as complete when it is connected to the ESB network for the first time. This is a proxy, and it has edge cases: a home vacant long enough to be disconnected can appear as a completion when it is reconnected, and a finished dwelling not yet connected does not appear.","source_url":"https://www.cso.ie/en/statistics/construction/newdwellingcompletions/","origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Seasonal — compare year on year","body":"Completions cluster toward the end of the year, so quarter-to-quarter movement largely tracks the building calendar. Only year-on-year change is flagged for these series.","source_url":null,"origin":"authored","interpretive":false,"country":"ie"},{"kind":"other","severity":"info","label":"Small authorities swing on single schemes","body":"In a smaller local authority one apartment scheme finishing can double a quarter's total on its own. Percentage changes are large and ordinary at this level, and describe construction scheduling more than housing policy.","source_url":null,"origin":"authored","interpretive":true,"country":"ie"}],"order":3,"is_total":false}],"group_key":null,"total_series_key":null,"aggregation":"sum"}]